PLM01-00312
| Plumbing Rough-in | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 13:44:00. Contact: ###-####.not ready for inspection. 2/27/2001 9:52:43 AM
|
PLM01-00072
| Final | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-00463
| Plumbing Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | CANC |
|
|
late pm ###-#### plumbing contractor called and canc. inspection. 2/27/2001 3:15:06 PM
|
PLM01-00342
| Plumbing Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PART |
|
|
###-#### area 7 first and second floor men and women restrooms waste and vents through roof water test ok. need hangers on horizontal vents in first and second floor plumbing chase 2/27/2001 4:14:53 PM
|
PLM01-00473
| Plumbing Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 2/27/2001 3:16:59 PM
|