BLD00-02926
| FIRE-Final Inspection | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 09:36:35. Contact: ###-####. need to test the alarms and sprinklers 2/27/2001 2:14:50 PM
|
FIR00-00289
| INSP-Sprinkler Rough-in | 2/23/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | PART |
|
|
9 am ###-#### fire pump test with reps from BC, CM, TVFP and UW. The suction pressure remained positive and all indications from pressure readings are the pump passed and will meet the system demand. 2/27/2001 10:44:14 AM
|
BLD00-01146
| FIRE-Final Inspection | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
fire fn - troy ###-####
|
FIR01-00036
| INSP-Sprinkler Rough-in/Hydro | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 16:17:37. Contact: ###-####. okay to cover 2/27/2001 2:59:53 PM
|
BLD00-03531
| FIRE-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 10:41:29. Contact: ###-####. discussed requirements for using firemaster listing; AHU shutdown detectors; exit signs and extinguishers 2/27/2001 3:54:54 PM
|
BLD00-01720
| FIRE-Sprinkler Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 2/27/2001 2:59:33 PM okay to cover
|