Inspections for the day of: Wednesday, February 27, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorGary Ziegler
TitlePLM-INSPECTOR
Phone #794-9379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-03947 Final2/26/20022/27/20022/27/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/26/2002 at 11:41:48. Contact: ###-####.
PLM01-04154 Final2/26/20022/27/20022/27/2002 12:00:00 AMAPASS
fn jake ###-####
PLM02-00457 Water and/or Sewer2/26/20022/27/20022/27/2002 12:00:00 AMAPASS
###-####
PLM02-00458 Water and/or Sewer2/26/20022/27/20022/27/2002 12:00:00 AMAPASS
###-#### EXCEL or ###-####
MIS02-00033 PLM-Conference2/27/20022/27/20022/27/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 334 On 2/27/2002 6:46:09 AM Jerry Hale contacted me about termination of the water at jobsite, I once again talked to him for about thirty minutes on the phone what he needed to do to comply with my correction notice of 2-15 02,he said he was going to contact Ana Shields the main o 2/27/2002 7:00:50 AM Scheduled byInspector: 334 On 2/27/2002 6:46:09 AM Jerry Hale contacted me about termination of the water at jobsite, I once again talked to him for about thirty minutes on the phone what he needed to do to comply with my correction notice of 2-15 02,he said he was going to contact Ana Shields the main owner to bear some of the cost . Mr. Hale said he was not the person that had been remodeling the structure, but that is contary to Prior renter that said that she watched him do the work himself gz 7:00:50 AM 2/27/2002 7:01:00 AM 2/27/2002 7:04:24 AM
PLM02-00448 Sprinkler (Final)2/27/20022/27/20022/27/2002 12:00:00 AMAPASS
Scheduled by Inspector: 334 On 2/27/2002 6:53:15 AM
MIS02-00033 PLM-Conference2/27/20022/27/20022/27/2002 12:00:00 AMPCANC
Scheduled by Inspector: 334 On 2/27/2002 7:05:24 AM
PLM02-00264 Plumbing Rough-in2/27/20022/27/20022/27/2002 12:00:00 AMPPASS
###-####
PLM02-00264 Plumbing Rough-in2/27/20022/27/20022/27/2002 12:00:00 AMPPASS
###-####
PLM02-00472 Plumbing Rough-in2/27/20022/27/20022/27/2002 12:00:00 AMPNR
###-####
PLM02-00056 Final2/27/20022/27/20022/27/2002 12:00:00 AMPPASS
###-####
PLM01-02795 Final2/27/20022/27/20022/27/2002 12:00:00 AMPPASS
bob ###-####
PLM01-02795 Final2/27/20022/27/20022/27/2002 12:00:00 AMPPASS
bob ###-####