PLM02-00311
| Final | 2/26/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00429
| Groundwork | 2/26/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 17:32:46. Contact: ###-####.
|
PLM01-04188
| Water and/or Sewer | 2/27/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 360 On 2/27/2002 10:25:00 AM test on water line (air) ok .need to disinfect water system as per u.p.c. 2000 609.9 and provide test result,s will call when completed 2/27/2002 2:20:32 PM
|
PLM01-03627
| Plumbing Rough-in | 2/27/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 360 On 2/27/2002 12:36:22 PM
|
PLM01-03621
| Plumbing Rough-in | 2/27/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 360 On 2/27/2002 12:47:48 PM conference only 2/27/2002 12:50:05 PM
|
PLM01-02105
| Plumbing Rough-in | 2/27/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 360 On 2/27/2002 3:13:26 PM third floor hot and cold water main,s test ok 2/27/2002 3:17:12 PM
|
PLM01-02107
| Plumbing Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 18:03:55. Contact: ###-####. third floor hot and cold water main,s tst ok 2/27/2002 3:15:45 PM
|
PLM01-02106
| Plumbing Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 18:05:39. Contact: ###-####. third floor hot and cold water main,s test ok 2/27/2002 3:16:22 PM
|