PLM03-00393
| Plumbing Rough-in | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | A | FAIL |
|
|
POLANSKY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wrong, got the trap and vent all screwed up on the washer box and the tie in in the crawlspace is a santee on its back 2/27/2003 10:13:55 AM
|
PLM03-00464
| Groundwork | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/26/2003 at 1:53:04 PM.
|
PLM03-00464
| Plumbing Rough-in | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/26/2003 at 1:53:46 PM. tie in venting, increase main water from tie in to bull head tee to 3/4" 2/27/2003 8:57:47 AM
|
PLM03-00471
| Water and/or Sewer | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | A | PASS |
|
|
eddie- ###-#### final ok 2/27/2003 8:34:56 AM
|
PLM03-00472
| Water and/or Sewer | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | A | PART |
|
|
###-#### sewer ok needs water 2/27/2003 9:28:31 AM
|
PLM03-00472
| Water and/or Sewer | 2/27/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | P | PASS |
|
|
water line
|
PLM03-00470
| Water Heater Final | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | P | PASS |
|
|
before 3pm ###-#### Gordy call first final ok 2/27/2003 2:24:53 PM
|
PLM03-00397
| Plumbing Rough-in | 2/26/2003 | 2/27/2003 | 2/27/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/26/2003 at 2:46:43 PM. Contact: ###-####. next sectio of main building drain ok will need to test as a complete main line to test couplings 2/27/2003 2:59:54 PM
|
PLM03-00439
| Plumbing Rough-in | 2/26/2003 | 2/27/2003 | 2/26/2003 12:00:00 AM | P | FAIL |
|
|
seems they need a building permit out here, no additional inspections to be done untill a building permit has been issued.
|