MEC05-02910
| Final | 2/27/2006 | 2/27/2006 | 2/27/2006 4:16:38 PM | P | PASS |
|
|
|
MEC06-00357
| Rough-in | 2/27/2006 | 2/27/2006 | 2/27/2006 3:33:55 PM | P | PASS |
|
|
rogh in re-inspection; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
|
MEC06-00636
| Pressure Test | 2/27/2006 | 2/27/2006 | 2/27/2006 3:27:39 PM | P | FAIL |
|
|
Chris is contact. Thanks.; Phone #: ###-#### Internet Inspection Request from: Mike Davisson test failed
|
MEC06-00631
| Pressure Test | 2/27/2006 | 2/27/2006 | 2/27/2006 2:52:40 PM | P | PART |
|
|
Please witness test on hydronics line, leave air in line. Please inspect as late this afternoon as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS radiant heating loop test ok.
|
PLM06-00531
| Final | 2/24/2006 | 2/27/2006 | 2/27/2006 2:17:52 PM | P | NR |
|
|
final water service when pvb is tested
|
MEC06-00265
| Pressure Test | 2/27/2006 | 2/27/2006 | 2/27/2006 1:35:32 PM | P | PASS |
|
|
reinspection; Phone #: ###-#### Internet Inspection Request from: misty evans
|
MEC06-00265
| Rough-in | 2/27/2006 | 2/27/2006 | 2/27/2006 1:35:16 PM | P | PASS |
|
|
reinspection ; Phone #: ###-#### Internet Inspection Request from: misty evans
|
MEC06-00263
| Pressure Test | 2/27/2006 | 2/27/2006 | 2/27/2006 1:34:59 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
MEC06-00263
| Rough-in | 2/27/2006 | 2/27/2006 | 2/27/2006 1:34:41 PM | P | PASS |
|
|
reinspection ; Phone #: ###-#### Internet Inspection Request from: misty evans
|
MEC06-00618
| Pressure Test | 2/27/2006 | 2/27/2006 | 2/27/2006 11:28:52 AM | P | PASS |
|
|
david ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MEC06-00607
| Rough-in | 2/24/2006 | 2/27/2006 | 2/27/2006 10:55:06 AM | A | PART |
|
|
###-#### vent through roof for free standing gas fireplace above the garage ok to cover. heating contractor needs to terminate gas line with an approved fitting at the wall.
|
MEC06-00082
| Pressure Test | 2/24/2006 | 2/27/2006 | 2/27/2006 10:27:55 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt gas test failed
|
MEC06-00082
| Rough-in | 2/24/2006 | 2/27/2006 | 2/27/2006 10:27:29 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt basement bath exhaust not complete
|
MEC05-03813
| Final | 2/24/2006 | 2/27/2006 | 2/27/2006 9:56:14 AM | A | PASS |
|
|
THANK YOU, KAREN; Phone #: ###-#### Internet Inspection Request from: Rick Lake
|
MEC06-00357
| Pressure Test | 2/24/2006 | 2/27/2006 | 2/27/2006 9:34:45 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
|
MEC06-00357
| Rough-in | 2/24/2006 | 2/27/2006 | 2/27/2006 9:34:28 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt vapor barrier required on supply branch fittings in attic.
|
MEC05-02910
| Final | 2/24/2006 | 2/27/2006 | 2/27/2006 9:16:29 AM | A | FAIL |
|
|
Internet Inspection Request from: Shelley Baisch 1st floor fireplace requires an accessable gas shutoff valve
|
PLM06-00562
| Water and/or Sewer | 2/27/2006 | 2/27/2006 | 2/27/2006 9:01:44 AM | P | PASS |
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
PLM06-00556
| Water and/or Sewer | 2/24/2006 | 2/27/2006 | 2/27/2006 8:50:49 AM | A | PASS |
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
PLM06-00556
| Final | 2/27/2006 | 2/27/2006 | 2/27/2006 12:00:00 AM | P | PASS |
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
PLM06-00562
| Final | 2/27/2006 | 2/27/2006 | 2/27/2006 12:00:00 AM | P | PASS |
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|