PLM06-00539
| Plumbing Rough-in | 2/27/2006 | 2/27/2006 | 2/27/2006 4:55:08 PM | P | PASS |
|
|
Sean; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
PLM06-00545
| Water and/or Sewer | 2/24/2006 | 2/27/2006 | 2/27/2006 3:09:25 PM | A | PASS |
|
|
###-#### - sam
|
PLM05-04309
| Med/Gas Systems | 2/24/2006 | 2/27/2006 | 2/27/2006 3:07:49 PM | A | PART |
|
|
med gas piping as noted on plan,s in RM job trailer for this date 2/27/06 24 hr. pressure test ok. ( note all vacuume from this date on will be brazed as required in NFPA 99C 2002 edition as per my conversation with Lee Rice chief plumbing inspector
|
PLM06-00550
| Water and/or Sewer | 2/24/2006 | 2/27/2006 | 2/27/2006 9:15:59 AM | A | PART |
|
|
tom ###-#### water test ok ok to cover contractor to call when building sewer is connected
|
PLM06-00545
| DOC - Permit Finaled | 2/27/2006 | 2/27/2006 | 2/27/2006 12:00:00 AM | P | PASS |
|
|
###-#### - sam
|