FIR05-00709
| INSP-Sprinkler Rough-in/Hydro | 2/27/2006 | 2/27/2006 | 2/27/2006 6:18:19 PM | P | PART |
|
|
The 1st and 2nd floors only are good for rough-in cover, the third floor needs a tenting inspection for cold cavity protection prior to approval for cover, also two heads at the living room and hall (3rd floor) do not meet min. spacing requirements for these heads.
|
BLD05-03410
| FIRE-Final Inspection | 2/27/2006 | 2/27/2006 | 2/27/2006 6:07:31 PM | P | PASS |
|
|
Life safety passed inspection.
|
FIR05-00890
| INSP-Final Inspection | 2/24/2006 | 2/27/2006 | 2/27/2006 2:50:48 PM | A | PASS |
|
|
Fire sprinkler work is complete, inspection passed.
|
BLD05-03230
| FIRE-Final Inspection | 2/27/2006 | 2/27/2006 | 2/27/2006 2:42:36 PM | P | PASS |
|
|
Life safety finaled.
|
FIR05-00879
| INSP-Final Inspection | 2/27/2006 | 2/27/2006 | 2/27/2006 11:39:40 AM | A | PASS |
|
|
Fire alarm work is satisfactory, fire alarm finaled.
|
BLD05-00748
| FIRE-Final Inspection | 2/24/2006 | 2/27/2006 | 2/27/2006 10:35:16 AM | A | PASS |
|
|
c/n items are complete, life safety finaled.
|