Inspections for the day of: Monday, February 27, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-00513 Final2/24/20062/27/20062/27/2006 4:26:57 PMPPASS
If inspection could happen as close to 1:30 that would work really well for the person meeting with inspector. Please call Sherri 30 minutes before going out. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC06-00624 Rough-in2/27/20062/27/20062/27/2006 4:26:20 PMPPASS
Rhonda; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00622 Rough-in2/27/20062/27/20062/27/2006 4:26:09 PMPPASS
Rhonda; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00623 Rough-in2/27/20062/27/20062/27/2006 4:25:30 PMPPASS
Rhonda; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00060 Rough-in2/27/20062/27/20062/27/2006 3:36:26 PMPPASS
Dwayne; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00642 Final2/27/20062/27/20062/27/2006 2:35:32 PMPPASS
James Tully ; Phone #: ###-#### Internet Inspection Request from: Kari Pagenkopf
MEC05-04275 Final2/27/20062/27/20062/27/2006 2:16:10 PMPFAIL
Scheduled by a contractor via Hello! on 2/27/2006 at 10:25:23 AM. Contact: ###-####. need condensate drains primary and secondary, not a complete inspection, wait for Dixie to do final
MEC06-00614 Rough-in2/24/20062/27/20062/27/2006 12:10:27 PMAPASS
charlie..call first..###-####
MEC06-00621 Final2/24/20062/27/20062/27/2006 11:20:17 AMAPASS
Scheduled by a contractor via Hello! on 2/24/2006 at 12:48:00 PM. Contact: ###-####.
MEC05-03860 Pressure Test2/24/20062/27/20062/27/2006 11:20:02 AMAPASS
###-####..steve
witnessed test at mezzanine to the cooling tower, witnessed test to heat side only at 9th floor
MEC06-00628 Rough-in2/24/20062/27/20062/27/2006 10:19:08 AMAPASS
Thomas -- call 30 minutes before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00497 Final2/22/20062/27/20062/27/2006 10:18:56 AMAPASS
ed ###-#### call first to verify if home
MEC06-00630 Final2/24/20062/27/20062/27/2006 10:02:35 AMAPASS
###-#### - harold
MEC06-00630 Pressure Test2/24/20062/27/20062/27/2006 10:02:22 AMAPASS
###-#### - harold
MEC06-00167 Final2/24/20062/27/20062/27/2006 8:54:02 AMAPASS
Scheduled by a contractor via Hello! on 2/24/2006 at 4:28:31 PM. Contact: ###-####.