FIR06-00777 INSP-Sprinkler Rough-in2/27/20072/27/20072/27/2007 5:34:56 PMPPASS
The 1" piping to the sidewall heads can be covered. Actual sizing will be verified when the requested resubmitted plans are on site for continuation of the inspection.
BLD06-03452 FIRE-Final Inspection2/26/20072/27/20072/27/2007 5:33:00 PMPCANC
Per dave the fire alarm is not ready for inspection yet.
BLD05-02192 FIRE-Final Inspection2/27/20072/27/20072/27/2007 5:31:57 PMPPASS
Life safety finaled
MIS07-00029 FIR-Final2/27/20072/27/20072/27/2007 2:29:54 PMPPASS
Life safety finaled
FIR06-00778 INSP-Sprinkler Rough-in2/26/20072/27/20072/27/2007 1:18:09 PMAPART
Need as-builts and the tenting modified as discussed prior to an ok to cover.
FIR06-00842 INSP-Sprinkler Rough-in/Hydro2/27/20072/27/20072/27/2007 1:01:25 PMAPASS
Overhead hydro test passed.
FIR07-00046 INSP-Sprinkler Rough-in/Hydro2/26/20072/27/20072/27/2007 11:43:13 AMAFAIL
Per the drawings and a subsequent phone conversation with Randy at DeBest, the sprinkler system in the coolers is designed for a .15 gpm density and is limited to a maximum storage height of 12'-0". The storage height as measured by me is at 19'-0". The system needs to be recalculated to the storage height being used or storage needs to be lowered pemanantly.
BLD06-00114 FIRE-Final Inspection2/26/20072/27/20072/27/2007 9:24:50 AMAPASS
life safety finaled
BLD06-00113 FIRE-Final Inspection2/26/20072/27/20072/27/2007 8:51:20 AMAPASS
life safety finaled
BLD06-00132 FIRE-Final Inspection2/26/20072/27/20072/27/2007 8:44:03 AMAPASS