BLD04-01308
| FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/28/2008 11:51:42 AM | P | PART |
|
|
Corrections verified for completion, fire life safety inspection passed.
|
BLD04-00079
| FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/28/2008 11:50:06 AM | A | PASS |
|
|
Correction notice items are complete, fire life safety finaled.
|
FIR07-00704
| INSP-Final Inspection | 2/25/2008 | 2/27/2008 | 2/28/2008 11:48:55 AM | P | PASS |
|
|
Corrections verified for completion, final alarm testing passed, permit finaled.
|
FIR08-00051
| INSP-Sprinkler Rough-in/Hydro | 2/26/2008 | 2/27/2008 | 2/27/2008 2:36:45 PM | A | PART |
|
|
Overhead rough-in is approved for cover at the NE quad as red-lined on stamped plans, one ret. strap attatched while on site, OH hydrostatic test completed in conjunction also passed.
|
FIR08-00037
| INSP-Sprinkler Rough-in/Hydro | 2/26/2008 | 2/27/2008 | 2/27/2008 12:45:10 PM | A | PART |
|
|
OH hydrostatic test for the east office area new branch lines and main passed inspection.
|
FIR07-00952
| FIR-Aging Inspection | 2/27/2008 | 2/27/2008 | 2/27/2008 12:40:33 PM | | DEFR |
|
|
Pending site inspection request.
|
BLD04-02484
| FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/27/2008 12:12:31 PM | A | FAIL |
|
|
Provide approved hardware at two locations including the aerobics room and spin class room, repair two non-functional EM lights, missing approved plan set on site.
|
FIR08-00096
| INSP-Final Inspection | 2/26/2008 | 2/27/2008 | 2/27/2008 11:55:02 AM | A | PASS |
|
|
Fire sprinkler work passed field inspection, storage too close to the new pendent head removed while on site and to remain clear within 18" of the defelector as discussed.
|
BLD07-01428
| FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/27/2008 11:52:51 AM | A | FAIL |
|
|
Provide signage at the main entry/exit door per review notes-"door to remain unlocked while building is occupied", need to remove locking hardware at the restroom vestibule to allow free egress.
|