Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00365 INSP-Sprinkler Rough-in/Hydro2/27/20122/27/20123/1/2012 7:51:54 AMPPART
See re-inspection notes listed under project related permit FIR11-00301.
BLD11-02589 FIRE-Final Inspection2/27/20122/27/20122/27/2012 5:19:02 PMPPASS
Correction items finished with the exception of single motion hardware at the back storage exit door. Lever set has been installed but does not meet a fail safe condition- tenant to provide approved style hardware at this location prior to structural final as agreed.
FIR12-00008 INSP-Final Inspection2/27/20122/27/20122/27/2012 5:14:34 PMPPASS
Verified relocated pendents at the adjacent vacant space, escutcheons installed. Fire sprinkler permit okayed for final.
FIR11-00408 INSP-Final Inspection2/27/20122/27/20122/27/2012 5:12:17 PMPPASS
Verified branchline restraints, final walkthrough passed. Permit finaled.
FIR11-00543 INSP-Sprinkler Rough-in2/27/20122/27/20122/27/2012 5:10:36 PMPPART
Remainder of overhead work at the west end of waiting 151 at the sheetrock ceiling okayed for cover- see plan set marked and initialed with today's date- contractor to provide missing hanger at one armover as discussed.
BLD12-00181 FIRE-Final Inspection2/27/20122/27/20122/27/2012 1:59:14 PMPPASS
C/N items finished. Fire life safety finaled.
FIR12-00097 INSP-Final Inspection2/27/20122/27/20122/27/2012 1:58:38 PMPPASS
Previous correction items verified for completion, scope of work passed inspection. Permit finaled.
BLD11-02991 FIRE-Final Inspection2/27/20122/27/20122/27/2012 1:56:01 PMPPASS
Fire life safety inspection completed satisfactory.
BLD11-01142 FIRE-Conference2/27/20122/27/20122/27/2012 1:54:55 PMPDONE
Gary Phone #: ###-####
BLD11-02991 FIRE-Alarm Testing2/24/20122/27/20122/27/2012 1:54:07 PMADONE
Completed testing for the two duct smoke detectors associated with the relocated RTU's.
FIR12-00032 INSP-Final Inspection2/24/20122/27/20122/27/2012 1:52:17 PMAPASS
Final walkthrough passed. Fire sprinkler permit finaled.
BLD11-02801 FIRE-Final Inspection2/24/20122/27/20122/27/2012 1:51:09 PMAPASS
Fire life safety passed. Battery backup at two new exit signs completed today per contractor.
FIR11-00631 INSP-Sprinkler Rough-in2/24/20122/27/20122/27/2012 1:47:50 PMAPART
Overhead work at the grid ceiling areas throughout are approved for cover. Noted semi-recessed heads at rooms with sheetrock ceilings and surface mounted light fixtures to meet obstruction criteria per NFPA 13 guidelines as discussed.