FIR12-00681
| INSP-Sprinkler Rough-in | 2/26/2013 | 2/27/2013 | 3/1/2013 4:22:12 PM | P | PART |
|
|
Noted corrections at the basement level shell work only.
|
FIR12-00721
| INSP-Sprinkler Rough-in | 2/26/2013 | 2/27/2013 | 3/1/2013 4:21:05 PM | P | PART |
|
|
Basement level only- not including the FP room
|
FIR12-00679
| INSP-Sprinkler Rough-in/Hydro | 2/27/2013 | 2/27/2013 | 3/1/2013 4:17:03 PM | P | PART |
|
|
Overhead rough-in inspection completed. Need to add retainers on sidewall head piping below tanks, heads at the zone of influence near unit heaters to be correct temp rating per NFPA 13.
|
BLD10-00774
| FIRE-Conference | 2/27/2013 | 2/27/2013 | 2/27/2013 1:52:51 PM | A | DONE |
|
|
Final pending open project attatched fire sprinkler permit.
|
FIR12-00679
| INSP-Sprinkler Rough-in/Hydro | 2/27/2013 | 2/27/2013 | 2/27/2013 1:39:30 PM | A | PART |
|
|
UG fire supply line hydrostatic testing passed.
|
BLD12-02646
| FIRE-Sprinkler Rough-in | 2/27/2013 | 2/27/2013 | 2/27/2013 1:31:40 PM | A | PART |
|
|
Overhead fire sprinkler work is approved for cover at the grid ceilings.
|