Inspections for the day of: Friday, February 27, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01173 General Inspection2/27/20152/27/20152/27/2015 2:16:53 PM PASS
ESC14-00299 General Inspection2/27/20152/27/20152/27/2015 1:53:10 PM PASS
No ESC issues at the time
ESC15-00031 Complaint Inspection2/27/20152/27/20152/27/2015 1:15:55 PMPPART
Per ACHD: Dewatering is taking place, traveling through silt fence and down ditch. Extremely turbid water. Also, a site prep inspection was required, which was not called in
Contractor has 3 settling ponds set up that they are discharging into. Due to the high level of groundwater, pumped water doesn't have enough time of settle out before discharging into a ditch.
Correction:
1.) Set primary well point to draw down groundwater level
2.) Place 5 clean gravel check dams inside the ditch to slow velocity and aid sediment drop out.
Contractor began making changing immediately
ESC14-00875 Aging Inspection2/27/20152/27/20152/27/2015 9:10:23 AM PASS
ESC14-00875 DOC - Permit Finaled2/27/20152/27/20152/27/2015 9:09:34 AMPPASS
ESC13-01199 General Inspection2/27/20152/27/20152/27/2015 8:37:56 AM PART
trackout in parking lot that needs swept
ESC13-01200 General Inspection2/27/20152/27/20152/27/2015 8:37:30 AM PART
trackout in parking lot that needs swept