ELE18-04416
| Final | 2/26/2019 | 2/27/2019 | 2/27/2019 2:58:36 PM | P | NH |
|
|
Ray Phone #: ###-####.... called left message with no return call 1:45PM went to residence- no answer and left notice at front door 2PM
|
ELE19-00586
| Final | 2/26/2019 | 2/27/2019 | 2/27/2019 1:42:15 PM | A | PASS |
|
|
Final in conjunction w/Old Dominion Solar Final Phone #: ###-#### Inspection requested via web by JENNY EMEL... labelling, disconnect, and OCPD ok
|
ELE19-00367
| Final | 2/26/2019 | 2/27/2019 | 2/27/2019 1:41:37 PM | P | PASS |
|
|
Please call before inspection Phone #: ###-#### Inspection requested via web by Matt Oranday... ok to final
|
ELE19-00043
| Electrical Rough-In | 2/27/2019 | 2/27/2019 | 2/27/2019 12:20:24 PM | P | PASS |
|
|
We need a cover inspection for the electrical room security wall. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins... wall inspections complete...ok to cover
|
ELE15-02449
| ELE-Aging Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 11:29:22 AM | | FAIL |
|
|
no access...final inspection needs scheduled...corrections need to be taken care of and inspection shall be scheduled within five days...further action will be taken
|
ELE19-00399
| Final | 2/22/2019 | 2/27/2019 | 2/27/2019 10:48:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brecklee Brown... labelling, disconnect, and OCPD ok
|
ELE19-00399
| Electrical Rough-In | 2/22/2019 | 2/27/2019 | 2/27/2019 10:47:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brecklee Brown... UL listed equipment verified by paperwork and panels at other job with same panels
|
ELE19-00487
| Electrical Rough-In | 2/26/2019 | 2/27/2019 | 2/27/2019 10:18:33 AM | A | PASS |
|
|
will not be on site. Please call at least 30 minutes prior Phone #: ###-#### Inspection requested via web by Jason Parke.... new 3 way location for existing lighting floor box changed out
|
ELE17-03422
| Conference | 2/25/2019 | 2/27/2019 | 2/27/2019 10:03:58 AM | A | PASS |
|
|
Please call Valad 30 min before for access. Phone #: ###-####... discussed new service location-complete and to code...wiring done, circuitry, future heated floor inspection requirement, approval of cover for certain areas-currently living at location...also fees need increased for work being done-service
|
ELE17-03422
| Rough-In Permanent Service | 2/27/2019 | 2/27/2019 | 2/27/2019 10:00:55 AM | A | PASS |
|
|
Please call Valad 30 min before for access. Phone #: ###-####... permit fees need increased for work-new service rough cover of new master bed/bath and garage new entry and living will be seperate rough inspection once new sub panel installed p/s u/g reconnect...moving meter location ok
|
ELE19-00680
| Final | 2/26/2019 | 2/27/2019 | 2/27/2019 8:50:46 AM | A | PASS |
|
|
Relocate circuit to new 40 amp max AC location copper 8-2 Phone #: ###-#### Inspection requested via web by TRENT Swaim... circuits for new gas furnace and A/C work thru attic and fished down walls ok to final
|
ELE18-04746
| Electrical Rough-In | 2/26/2019 | 2/27/2019 | 2/27/2019 8:28:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton... ceiling grid and receps front reception
|
ELE19-00683
| Rough-In Permanent Service | 2/26/2019 | 2/27/2019 | 2/26/2019 12:04:22 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Icon Electric Inspection cancelled from web by: Icon Electric
|