Inspections for the day of: Thursday, February 27, 2020.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-02700 Electrical Rough-In2/27/20202/27/20202/27/2020 2:12:05 PMPPASS
Contact Brandon for lightning protection ground loop system. Phone #: ###-#### Inspection requested via web by Tom Betty Grounding ring as mark on contractors print only ok to cover
ELE20-00611 Electrical Rough-In2/27/20202/27/20202/27/2020 2:10:14 PMPPASS
Please call half hour before. I can meet you for access. Thanks Phone #: ###-#### Inspection requested via web by mark hood kitchen, Laundry, Main bath ok to cover. (Discussed service. No inspection record. Will need to replace mast and service coductors. Visable burn marks on Polaris taps and service drop conductors as well as 2in weather head on 1 1/2in conduit. Grounding will also need to be brought up to date. Conduits entering top of panel using raintight connectors will need to install sealing locknuts.)
ELE20-00414 Temporary Service2/26/20202/27/20202/27/2020 12:59:07 PMPPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE19-04286 Temporary Service2/26/20202/27/20202/27/2020 12:51:35 PMPPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE20-00136 Final2/26/20202/27/20202/27/2020 10:23:55 AMAPASS
Connor Phone #: ###-#### final ok
ELE20-00684 Temporary Service2/26/20202/27/20202/27/2020 9:44:04 AMAPASS
Phone #: ###-#### Inspection requested via web by Robert Schroder t/s u/g n ok
ELE20-00371 Rough-In Permanent Service2/26/20202/27/20202/27/2020 9:33:07 AMAPASS
Phone #: ###-#### Inspection requested via web by Ryan Wake Corrections made rough in ok p/s u/g n ok
ELE20-00504 Rough-In Permanent Service2/26/20202/27/20202/27/2020 9:10:37 AMAFAIL
Phone #: ###-#### Inspection requested via web by Troy Ballard level 2 Bottom of stairs has been re-framed. Boxes hanging on wires, switch legs need re-routed and smoke detector relocated