BLD00-02824
| BLD-Framing/Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PASS |
|
|
###-####
interior drywall shear ok 2/28/2001 12:29:42 PM
|
BLD00-03388
| BLD-Footing | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 2/27/2001 3:08:00 PM
already poured 2/28/2001 10:42:54 AM
|
MEC00-04303
| Final | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 16:49:03. Contact: ###-####.
c/n posted 2/28/2001 11:07:33 AM
|
BLD00-03388
| BLD-Foundation | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 06:50:08. Contact: ###-####.
not all the done 2/28/2001 11:10:41 AM
|
BLD00-01524
| BLD-Final | 2/26/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | FAIL |
|
|
Sheila, ###-#### - call 1st so she can meet you there
need smoke det. in stairway and in basement, tempered glass by front entry x 2 no c/n posted, bond for landscape is in place 2/28/2001 12:11:44 PM
|
MEC00-04507
| Final | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 10:20:58. Contact: ###-####.
|
BLD01-00184
| BLD-Framing/Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
###-####
ok to insulate and rock after electrical rouph pass 2/28/2001 2:26:26 PM
|
BLD00-03388
| BLD-Foundation | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 2/28/2001 10:53:10 AM
|