BLD00-02403
| BLD-Energy code compliance | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00154
| BLD-Framing/Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-01329
| BLD-Final | 2/27/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 16:19:47. Contact: .
|
BLD00-03407
| BLD-Framing/Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 06:48:48. Contact: ###-####.Ok to insulate--c/n issued 2/28/2001 12:43:14 PM
|
BLD01-00338
| BLD-Foundation | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 07:21:24. Contact: ###-####. wip--rebar ok 2/28/2001 11:42:32 AM
|
MEC01-00582
| Final | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | A | NR |
|
|
###-####
|
BLD01-00036
| BLD-Foundation | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
###-#### pouring at 3: wip--appears ok 2/28/2001 3:35:27 PM
|
BLD01-00004
| BLD-Footing | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
ft insp dan-- ###-#### setbacks ok--wip, appears ok. 2/28/2001 2:04:20 PM
|
BLD00-02446
| BLD-Framing/Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
Items on c/n 2-26-01 completed with exception to retrofitting or engineering on holdown straps in back of building which were installed out of position. 2/28/2001 1:35:00 PM
|
BLD00-03145
| BLD-Energy code compliance | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-03684
| BLD-Framing/Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
###-#### Ok to insulate--Need to verify bci repair above kitchen at energy. 2/28/2001 1:44:43 PM
|
BLD01-00270
| BLD-Foundation | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PART |
|
|
###-#### wip--rebar ok--hd not installed at time of inspection. 2/28/2001 2:18:00 PM
|
BLD00-02026
| BLD-Conference | 2/28/2001 | 2/28/2001 | 2/28/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 2/28/2001 3:22:44 PM Met with petra, Dave lightfoot, Dixie in regards to covering portion of lodge without mechanical, no duck for heat or air(window units) exhaust fan chases were to be left open pending mechanical inspections). 2/28/2001 3:24:16 PM
|