PLM02-00127
| Plumbing Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 14:59:02. Contact: ###-####.
|
PLM02-00399
| Plumbing Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 15:55:25. Contact: ###-####.
|
PLM02-00477
| Plumbing Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
MARK ###-####
|
PLM01-03729
| Water and/or Sewer | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 330 On 2/28/2002 8:05:24 AM no more pipe for this am 2/28/2002 9:26:50 AM
|
PLM01-03729
| Water and/or Sewer | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 2/28/2002 9:27:02 AM another 30' 2/28/2002 5:51:28 PM
|
PLM02-00343
| Groundwork | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 09:43:48. Contact: ###-####. test on the repaired containment piping from the chem rooms to the sump 2/28/2002 5:52:07 PM
|
PLM02-00479
| Plumbing Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | FAIL |
|
|
rory ###-####hang abs every 4" in crawlspace, vent shower and expose p-trap for inspection, only one trap per waste arm, no connection shall be made to a closet arm, call for a conference. 2/28/2002 5:54:17 PM
|
PLM02-00007
| Plumbing Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
lee ###-####
|
PLM02-00483
| Plumbing Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | NR |
|
|
MARK ###-####
|
PLM02-00483
| Groundwork | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 2/28/2002 5:59:46 PM
|
PLM02-00474
| Water and/or Sewer | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 20:16:31. Contact: ###-####. use the approved interceptor, install venting, install compressor room drainage, use approved transition at abs/pvc joint in sewer, 2/28/2002 5:56:34 PM
|
PLM02-00474
| Water and/or Sewer | 2/27/2002 | 2/28/2002 | 2/27/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 20:12:35. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/27/2002 at 20:14:13.
|