BLD01-03061
| BLD-Energy code compliance | 2/28/2002 | 2/28/2002 | 3/1/2002 12:00:00 AM | P | NR |
|
|
###-#### michele
|
MEC01-03590
| Conference | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/28/2002 10:31:03 AM w/ owner re htg final, show c/n, recall.
|
BLD01-00594
| BLD-Conference | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### re guards...handrails, ok. 2/28/2002 5:20:43 PM
|
BLD01-00106
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
fn pat ###-#### ; ok for c/o 2/28/2002 10:59:31 AM
|
MEC01-03590
| Conference | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | CANC |
|
|
Added by Inspector: 340 On 2/28/2002 9:52:40 AM
|
MEC02-00556
| Rough-in | 2/26/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:52:59. Contact: ###-####...need p.t, r/i ok 2/28/2002 10:12:17 AM
|
BLD01-02193
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
###-####, need plans & other signatures, homeowner for comm'l grade kitchen at residence. 2/28/2002 10:13:29 AM
|
MEC02-00507
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 09:34:44. Contact: ###-####. need 3" to combustible door 2/28/2002 2:30:14 PM
|
MEC01-03511
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 12:07:56. Contact: ###-####.
|
MEC02-00586
| Pressure Test | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
DENIG ###-####
|
BLD01-02373
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 15:58:24. Contact: ###-####. c/n issued, need orig c/n, spec for ridge hanger at truss, dbl tji250's deleted at main floor...fireblocks; ok to insul 2/28/2002 4:27:55 PM
|
BLD01-02922
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
SHANE ###-#### SHEER NAIL, ext n 2/28/2002 11:41:42 AM ailing ok; has int gyp shear panels too. 2/28/2002 11:42:56 AM
|
BLD01-03156
| BLD-Footing | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 17:18:37. Contact: ###-####...1st lift cols. at entry ok. 2/28/2002 5:30:05 PM
|
BLD01-03006
| BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | NR |
|
|
###-####; unable to contact left msg. 2/28/2002 6:14:46 PM
|
BLD01-03198
| BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 08:19:16. Contact: ###-####. walls ok to cover
2/28/2002 4:57:51 PM
|
MEC02-00408
| Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 08:25:29. Contact: ###-####.
|
MEC02-00408
| Pressure Test | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | NR |
|
|
|
MEC02-00370
| Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 08:36:17. Contact: .
LORI CALLED IN TO CANC THIS INSPECTION AND WILL SET UP ANOTHER INSPECTION FOR THE NEXT DAY.....2-28-02 //DLD
|
MEC02-00370
| Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 08:36:17. Contact: .per contractor 2/28/2002 1:45:12 PM
|
BLD01-02193
| BLD-Final | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | FAIL |
|
|
###-####; keep c/n. 2/28/2002 5:18:04 PM
|
BLD02-00092
| BLD-Final | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01302
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | NR |
|
|
fn peggy ###-#### or mark ###-####
|
BLD02-00310
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
mark ###-#### fr
|
BLD00-03507
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | NR |
|
|
mark ###-#### fn
|
MEC02-00580
| Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
DAVE ###-#### grease duct & shaft ok 2/28/2002 4:32:40 PM
|
BLD02-00310
| BLD-Energy code compliance | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
mark ###-####
|
BLD02-00310
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
MARK ###-####
|
MEC02-00597
| Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | FAIL |
|
|
todd ###-#### r/i ..need permanent sealant for supply duct at r/a; failed p.t. 3/1/2002 11:15:37 AM
|
BLD01-03163
| BLD-Conference | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
###-####, need details, add'l insps for firewalls...no good as built. 2/28/2002 12:20:11 PM
|