PLM01-03961
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
KEVIN ###-####
|
PLM02-00176
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 18:04:57. Contact: ###-####.
|
PLM02-00446
| Sprinkler (Final) | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
###-#### ready now
|
PLM02-00476
| Groundwork | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 10:23:45. Contact: ###-####.backwater valve required 3/1/2002 1:21:48 PM
|
PLM02-00451
| Water and/or Sewer | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
water line from meter box to existing well line on south side of drive way 2/28/2002 2:02:36 PM
|