BLD02-00241
| BLD-Footing | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
van-- ###-#### ft
|
MEC02-00538
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 13:03:09. Contact: ###-####. Gas test by gas comp. 2/28/2002 12:29:04 PM
|
BLD01-01955
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### Jory Truss company repaired truss. 2/28/2002 5:08:24 PM
|
BLD02-00171
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
###-#### c/n posted. 2/28/2002 12:03:57 PM
|
MEC02-00588
| Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### gary
|
BLD99-00444
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | CANC |
|
|
JOHN ###-#### LOCK BOX # 193 This is not ready needs other required signatures. 2/28/2002 10:23:24 AM
|
MEC02-00589
| Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
###-#### Needs exhaust fan in bathroom and exposewd metal duct insulate, c/n 2/28/2002 10:38:30 AM
|
MEC02-00462
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 15:46:47. Contact: ###-####. 12:30 not home. 2/28/2002 1:17:25 PM
|
BLD01-03204
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
###-####c/n posted. Note front carport ,was build by prior owner and has a beam at the west site supporting the rigge beam that has some defletion ,told new owner that this would need to be before final. the area is covered with wood siding now.no plans for this area. 2/28/2002 3:11:22 PM 2/28/2002 3:12:16 PM
|
MEC02-00129
| Pressure Test | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:18:03. Contact: ###-####. UNable to do , recalled for tomorow. 2/28/2002 5:28:24 PM
|
MEC01-02740
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:19:05. Contact: ###-####.
|
MEC02-00505
| Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:21:02. Contact: ###-####. Prior c/n damper for fresh air installed and to be accessable. 2/28/2002 10:19:57 AM
|
MEC02-00505
| Pressure Test | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:21:24. Contact: ###-####.by 411. 2/28/2002 10:19:31 AM
|
BLD01-00736
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
CLAY ###-####
|
MEC01-03792
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 411 On 2/27/2002 6:08:19 PM Posted c/n on unit firecaulk ele and gas line in garage. 2/28/2002 3:40:45 PM
|
BLD01-02947
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 19:23:23. Contact: ###-####.
|
BLD01-03194
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 19:24:30. Contact: ###-####.
|
BLD01-03187
| BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 19:25:41. Contact: ###-####. Needs landing at rear door and insulation certificate posted. c/n. 2/28/2002 10:55:08 AM
|
BLD02-00017
| BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD02-00149
| BLD-Energy code compliance | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 09:46:04. Contact: ###-####.
|
MEC02-00581
| Pressure Test | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-03264
| BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
the later the better\\###-#### To many others to do. 2/28/2002 5:43:00 PM
|
MEC02-00164
| Final | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 10:30:49. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/28/2002 at 11:26:28.
|
BLD02-00160
| BLD-Footing | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
dane ###-#### to many other to do this day. 2/28/2002 5:58:23 PM
|
BLD98-01070
| BLD-Conference | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | DONE |
|
|
Scheduled by Inspector: 407 On 2/28/2002 1:53:12 PM Just wanted to veiw history on this. 2/28/2002 1:55:09 PM
|
BLD01-00729
| BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 2/28/2002 4:00:14 PM
|
BLD01-00737
| BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 2/28/2002 4:00:33 PM
|
BLD02-00184
| BLD-Wall cover | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:27:07. Contact: ###-####. to many others to do. 2/28/2002 5:44:06 PM
|
MEC02-00516
| Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 15:52:44. Contact: ###-####. to many others to do. 2/28/2002 5:50:24 PM
|
MEC02-00516
| Pressure Test | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 15:53:02. Contact: ###-####. to many others to do. 2/28/2002 5:50:37 PM
|
BLD01-02519
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
shear wall. to many others this day. 2/28/2002 5:56:17 PM
|
BLD01-02988
| BLD-Framing/Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 15:33:21. Contact: ###-####. to many others this day recall for tomorow. 2/28/2002 5:53:16 PM
|