ELE02-00506
| Electrical Rough-In | 2/26/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 12:59:01. Contact: ###-####.part ok office cubicals ok 2/28/2002 8:56:25 AM
|
ELE02-00531
| Rough-In Permanent Service | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### ALAN
p/s u/g n ok
ok cover ri 2/28/2002 10:13:25 AM
|
ELE01-04078
| Rough-In Permanent Service | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
###-####
p/s u/g n ok
ok cover ri 2/28/2002 11:28:12 AM
|
ELE02-00466
| Temporary Service | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### TERY
t/s u/g n ok 2/28/2002 10:22:43 AM
|
ELE01-03378
| Electrical Rough-In | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 412 On 2/28/2002 8:57:14 AM ok part tool connections
|
ELE02-00139
| Electrical Rough-In | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 412 On 2/28/2002 8:58:00 AM ok part tool connections
|
ELE02-00237
| Permanent Service | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 412 On 2/28/2002 9:50:48 AM p/s u/g n ok
|
ELE01-04282
| Final | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
JUSTIN CELL # ###-#### BCC all ceiling tile to be removed before inspection 2/28/2002 9:50:14 AM
|
ELE02-00531
| Electrical Rough-In | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 412 On 2/28/2002 10:14:49 AM survey need outlet within 25ft of A.C.
|
ELE01-01715
| Final | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
fn on the house-- vivian ###-####- gar door code 1549 ok final 2/28/2002 12:17:24 PM
|
ELE02-00538
| Electrical Rough-In | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
###-#### home owner will be home after 4:00 home owner conf. 2/28/2002 1:02:33 PM
|
ELE02-00451
| Permanent Service | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello need to ground all metal in building
p/s o/h reconnect ok
2/28/2002 2:44:50 PM
|
ELE02-00543
| Electrical Rough-In | 2/28/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | FAIL |
|
|
rory- cell ###-#### wiring wrong for three switches, needs pigtails & wirenuts for all grounds in all boxes 2/28/2002 1:59:38 PM
|
ELE02-00535
| Electrical Rough-In | 2/27/2002 | 2/28/2002 | 2/28/2002 12:00:00 AM | P | PASS |
|
|
ALAN ###-#### survey outlet rt of kit sink may be over 2ft ok cover ri
p/s u/g n ok 2/28/2002 1:26:34 PM
|