Inspections for the day of: Friday, February 28, 2003.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-00497 Pressure Test2/27/20032/28/20032/28/2003 12:00:00 AMANH
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
MEC03-00497 Final2/27/20032/28/20032/28/2003 12:00:00 AMANH
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
BLD02-01181 BLD-Final2/27/20032/28/20032/28/2003 12:00:00 AMAPASS
###-####
BLD02-02618 BLD-Final2/27/20032/28/20032/28/2003 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 2/27/2003 at 2:30:55 PM. Contact: ###-####.
BLD03-00108 BLD-Framing/Rough-in2/27/20032/28/20032/28/2003 12:00:00 AMPPASS
NED CELING; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-03043 BLD-Final2/27/20032/28/20032/28/2003 12:00:00 AMPFAIL
RANDY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I called and left message with Randy, He called me back and I told him that at the time they paid the sewer fees, that same person was given information on the work area that was required to be accessible, as was indicated on permit writing. He said he will lower the cabinets to 34". NOTE: originally the sink had been crossed out on the floor plan, and apperently they elected not to put it in, and pulled a permit after plans were issued.Sewer fee have now been paid. 2/28/2003 4:01:07 PM
MEC03-00539 Pressure Test2/28/20032/28/20032/28/2003 12:00:00 AMPPASS
call for access ###-####
MEC02-03338 Final2/28/20032/28/20032/28/2003 12:00:00 AMPFAIL
randy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. insulation has not been put on pipe,as told to contractor. builder on site notified and left message with Randy. 2/28/2003 2:57:17 PM