Inspections for the day of: Monday, February 28, 2005.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00205 BMP Violation2/24/20052/28/20052/28/2005 12:00:00 AMAFAIL
Issued Stop Work Order--Posted on telephone pole. Per last weeks correction notice all applicable conditions attached to ESC permit were to be in place by the end of the day on 2/27/05 or stop work was to be issued. No provisions in place currently; concrete was washed out at main road way into work site, no const. entrance, no trash container etc. Call for re-inspection when complete. 2/28/2005 8:13:57 AM
ESC04-01233 BMP Violation2/25/20052/28/20052/28/2005 12:00:00 AMPPART
Correction to rp--need to protection d.inlets, install snow fence to limit access onto bare dirt. Will follow up. 3/1/2005 9:34:20 AM
ESC05-00205 BMP Violation2/28/20052/28/20052/28/2005 12:00:00 AMPPASS
Stop work lifted. Verfied by Aimee that correction were in place. Continue to comply with esc conditions. 2/28/2005 3:41:56 PM
ESC04-01601 Site Preparation2/28/20052/28/20052/28/2005 12:00:00 AMPPART
ESC04-01601 Conference2/28/20052/28/20052/28/2005 12:00:00 AMPFAIL
RP information not provided to The City of Boise. Provide information within 24 hours or stop work will be issued. 2/28/2005 3:43:49 PM