Inspections for the day of: Monday, February 28, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-03683 Final2/25/20052/28/20052/28/2005 12:00:00 AMAPASS
Laura; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
BLD04-01836 BLD-Final2/28/20052/28/20052/28/2005 12:00:00 AMACANC
dale; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ 2/28/2005 1:03:39 PM
BLD05-00142 BLD-Footing2/28/20052/28/20052/28/2005 12:00:00 AMPPASS
jerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD05-00456 BLD-Footing2/28/20052/28/20052/28/2005 12:00:00 AMPCANC
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD04-02879 BLD-Footing2/28/20052/28/20052/28/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/28/2005 at 9:16:26 AM. Contact: ###-####.
BLD05-00191 BLD-Footing2/28/20052/28/20052/28/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/28/2005 at 9:30:10 AM. Contact: ###-####.
BLD05-00192 BLD-Footing2/28/20052/28/20052/28/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/28/2005 at 9:32:52 AM. Contact: ###-####.
BLD04-01711 BLD-Framing/Rough-in2/28/20052/28/20052/28/2005 12:00:00 AMPPART
Please call prior to inspection///gil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2/28/2005 4:29:01 PM checked hold downs added on inside per new engineering ok framing ok to insulate check fire blocking at energy code inspection 2/28/2005 4:34:53 PM
BLD05-00275 BLD-Footing2/28/20052/28/20052/28/2005 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 2/28/2005 at 11:27:50 AM. Contact: ###-####.excavater on site still digging hole 2/28/2005 1:16:35 PM