Inspections for the day of: Tuesday, February 28, 2006.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00040 INSP-Sprinkler Rough-in2/27/20062/28/20063/1/2006 9:26:01 AMAPASS
Sprinkler piping is ok to cover.
FIR06-00107 INSP-Final Inspection2/27/20062/28/20063/1/2006 8:51:52 AMAPASS
Permit finaled. I spoke to the general contractor about the smoke detector/smoke evac system requirements and the requirement for the sprinkler system to be modified when the ceilings are demo'd
FIR05-00839 INSP-Sprinkler Rough-in/Hydro2/27/20062/28/20062/28/2006 3:51:28 PMAPASS
Above ground hydro test passed. The test was witnessed by the general contractor. Need to get copy of test papers.
BLD05-03340 FIRE-Final Inspection2/27/20062/28/20062/28/2006 10:54:38 AMAPASS
Life safety finaled
FIR06-00023 INSP-Final Inspection2/28/20062/28/20062/28/2006 10:53:06 AMPPASS
permit finaled
FIR06-00067 INSP-Final Inspection2/27/20062/28/20062/28/2006 10:49:56 AMAPASS
Permit finaled
BLD05-02937 FIRE-Final Inspection2/27/20062/28/20062/28/2006 10:02:50 AMAFAIL
mike ; Phone #: ###-#### Could not contact mike and no approved plans on site. No inspection performed
MIS06-00040 FIR-Final2/24/20062/28/20062/28/2006 9:57:29 AMAPART
A temporary occupancy was given until the following items have been corrected. Approved hardware is needed on the 300 door and emergency lighting is needed in all paths of egress as discussed.
BLD05-02175 FIRE-Final Inspection2/28/20062/28/20062/28/2006 9:21:41 AMPPASS
Life safety finaled. Structural inspector will verify that the indicator and address is installed.
FIR05-00839 INSP-Sprinkler Rough-in2/27/20062/28/20062/28/2006 8:57:56 AMAPART
Need to provide one additional pipe hanger on the 1" armover over the north offices. Provide revised hydraulic calculations for 127sq. ft. sprinkler spacing. Provide certification for the backflow and forward flush. Provide tag for riser.