FIR06-00040
| INSP-Sprinkler Rough-in | 2/27/2006 | 2/28/2006 | 3/1/2006 9:26:01 AM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR06-00107
| INSP-Final Inspection | 2/27/2006 | 2/28/2006 | 3/1/2006 8:51:52 AM | A | PASS |
|
|
Permit finaled. I spoke to the general contractor about the smoke detector/smoke evac system requirements and the requirement for the sprinkler system to be modified when the ceilings are demo'd
|
FIR05-00839
| INSP-Sprinkler Rough-in/Hydro | 2/27/2006 | 2/28/2006 | 2/28/2006 3:51:28 PM | A | PASS |
|
|
Above ground hydro test passed. The test was witnessed by the general contractor. Need to get copy of test papers.
|
BLD05-03340
| FIRE-Final Inspection | 2/27/2006 | 2/28/2006 | 2/28/2006 10:54:38 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00023
| INSP-Final Inspection | 2/28/2006 | 2/28/2006 | 2/28/2006 10:53:06 AM | P | PASS |
|
|
permit finaled
|
FIR06-00067
| INSP-Final Inspection | 2/27/2006 | 2/28/2006 | 2/28/2006 10:49:56 AM | A | PASS |
|
|
Permit finaled
|
BLD05-02937
| FIRE-Final Inspection | 2/27/2006 | 2/28/2006 | 2/28/2006 10:02:50 AM | A | FAIL |
|
|
mike ; Phone #: ###-#### Could not contact mike and no approved plans on site. No inspection performed
|
MIS06-00040
| FIR-Final | 2/24/2006 | 2/28/2006 | 2/28/2006 9:57:29 AM | A | PART |
|
|
A temporary occupancy was given until the following items have been corrected. Approved hardware is needed on the 300 door and emergency lighting is needed in all paths of egress as discussed.
|
BLD05-02175
| FIRE-Final Inspection | 2/28/2006 | 2/28/2006 | 2/28/2006 9:21:41 AM | P | PASS |
|
|
Life safety finaled. Structural inspector will verify that the indicator and address is installed.
|
FIR05-00839
| INSP-Sprinkler Rough-in | 2/27/2006 | 2/28/2006 | 2/28/2006 8:57:56 AM | A | PART |
|
|
Need to provide one additional pipe hanger on the 1" armover over the north offices. Provide revised hydraulic calculations for 127sq. ft. sprinkler spacing. Provide certification for the backflow and forward flush. Provide tag for riser.
|