Inspections for the day of: Tuesday, February 28, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03403 BLD-Framing/Rough-in2/28/20062/28/20062/28/2006 6:24:07 PMPPASS
ceiling insp -- guy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Pending elec. and Mech. insp. above grid.
MIS06-00040 BLD-Final2/24/20062/28/20062/28/2006 4:10:51 PMPPASS
before 4:00///please call 30 min prior///tiffany; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Temp occ given. Will be ok for perm occ once life/safety has finaled.
BLD05-01422 BLD-Framing/Rough-in2/28/20062/28/20062/28/2006 3:22:04 PMPFAIL
Anthony; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 1.- Remove all nonrated boxes from 1 hr. wall.
2.- Replace 5/8 inch type X sheet rock above celing were plumbers punched in the holes.
3.- Framing members not allowed to penetrate 1hr. wall. c/n posted. do not cover.
BLD05-03113 BLD-Energy code compliance2/27/20062/28/20062/28/2006 2:20:47 PMPPASS
Troy -- for framing and energy code insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-03113 BLD-Framing/Rough-in2/27/20062/28/20062/28/2006 2:20:33 PMPPASS
Troy -- for framing and energy code reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Lateral bracing added to T27 truss.
BLD05-02598 BLD-Framing/Rough-in2/28/20062/28/20062/28/2006 2:13:17 PMPPASS
Bob -- wall insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Stemwall insp was performed.
BLD05-02706 BLD-Framing/Rough-in2/27/20062/28/20062/28/2006 2:03:30 PMPFAIL
Internet Inspection Request from: Carey Allen. Complete lateral bracing on B2 trusses. Add lateral bracing at overbuild areas. Add additional studs at C2 girder truss. Install TBE's at C2 truss as noted on engineering. c/n posted. ok to insulate.
BLD05-02937 BLD-Final2/27/20062/28/20062/28/2006 11:35:54 AMPNR
mike ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs fire final.
BLD05-02416 BLD-Concrete2/27/20062/28/20062/28/2006 10:51:50 AMAPART
center footing & rebar ready Internet Inspection Request from: Adrian Marriage
BLD06-00330 BLD-Foundation2/24/20062/28/20062/28/2006 9:51:44 AMAPART
rob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa.
BLD05-03365 BLD-Energy code compliance2/27/20062/28/20062/28/2006 9:02:25 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Steven Stover. All framing issues have been repaired per c/n. ok to cover pending mech. ri insp. 9pressure test). c/n posted.
BLD05-02706 BLD-Framing/Rough-in2/27/20062/28/20062/27/2006 9:00:04 PMPCANC
Internet Inspection Request from: Carey Allen Inspection cancelled from web by: Carey Allen