Inspections for the day of: Wednesday, February 28, 2007.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00136 INSP-Final Inspection2/27/20072/28/20072/28/2007 5:00:43 PMADEFR
Inspection to be rescheduled.
FIR05-00612 INSP-Final Inspection2/27/20072/28/20072/28/2007 4:57:40 PMAFAIL
Doors at one location will need repair for proper closure upon smoke detection.
FIR06-00539 INSP-Final Inspection2/28/20072/28/20072/28/2007 4:18:00 PMPCANC
Forest,
Could you close this permit?
Thanks,
Rob Inspection cancelled from web by: Terry Owsley
FIR06-00538 INSP-Final Inspection2/28/20072/28/20072/28/2007 4:17:53 PMPCANC
Forest,
Could you close this permit?
Thanks,
Rob Inspection cancelled from web by: Terry Owsley
FIR06-00537 INSP-Final Inspection2/28/20072/28/20072/28/2007 4:17:17 PMPCANC
Forest,
Could you close this permit?
Thanks,
Rob Inspection cancelled from web by: Terry Owsley
FIR06-00658 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 2:51:10 PMPPART
OH hydrostatic test of the wet system passed, rough-in is okay, noted the need to install flex couplings at the mains on each side of the CMU wall where the pipe passes through and min. seismic clearance is not provided.
FIR06-00535 FIR-Aging Inspection2/28/20072/28/20072/28/2007 2:04:54 PM DONE
Project still under construction.
BLD06-01747 FIRE-Final Inspection2/27/20072/28/20072/28/2007 1:58:30 PMAPASS
Fire life safety inspection passed.
FIR06-01005 INSP-Final Inspection2/28/20072/28/20072/28/2007 1:57:07 PMPPASS
Fire sprinkler permit finaled.
BLD06-02576 FIRE-Final Inspection2/28/20072/28/20072/28/2007 1:54:42 PMPPASS
Fire life safety inspection passed, contractor to replace three missing escutcheons and update the cert. tag on the provided PFE.
MIS06-00150 FIR-Final2/28/20072/28/20072/28/2007 1:52:35 PMPFAIL
Provide current certification tag for the fire extinguisher, need keyed lock and signage at the main entry/exit door.
BLD06-03623 FIRE-Final Inspection2/27/20072/28/20072/28/2007 1:05:52 PMAFAIL
Door hardware at the new door does not meet code requirements or approved plans -see keynote #1 on plans, the provided fire extinguisher exceeds max. allowable travel distance within the space.
FIR07-00055 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 12:18:46 PMAFAIL
Upright heads at one branch line exceed max. spacing allowed as marked on approved plans.
FIR07-00054 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 12:17:32 PMAFAIL
The min. seperation distance is not met for two pendents at one location, noted added head and one deleted head as well as pipe route changes to be shown on as-built plans.
FIR07-00053 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 12:14:50 PMAFAIL
Missing hangers and seismic bracing on the 2 1/2 " main., provide as-built plans for the field modifications.
FIR07-00051 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 12:13:08 PMAFAIL
Upright at the NW corner of the TI is obstructed, one pendent head in the open area is overspaced.
FIR07-00050 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 12:11:04 PMAPART
OH rough-in installation is acceptable, provide as-built plans for field modifications to pipe routing, need to verifiy non-sprinklered combustible cavities are completely filled with insulation for allowance of the exception per NFPA 13 prior to OH cover.
FIR06-01023 INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20072/28/2007 12:06:10 PMAFAIL
Missing seismic bracing at the main, field mods will require as-built plans.