FIR12-00026
| INSP-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 4:54:55 PM | P | FAIL |
|
|
Plans do not match installation, number of devices or scope of work completed.
|
FIR11-00435
| INSP-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 4:52:09 PM | P | PART |
|
|
Final pending corrections per 430 completed 8/29/11 regarding sync issues.
|
FIR11-00371
| INSP-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 4:49:18 PM | P | PASS |
|
|
Fire sprinkler permit finaled. Inspection passed.
|
BLD11-02870
| FIRE-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 4:48:23 PM | P | NR |
|
|
Pending ceiling tile installation, address numbers, project related FIR permit final. Exits and EM lights tested okay.
|
FIR12-00015
| INSP-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 4:46:54 PM | P | NR |
|
|
|
BLD11-02020
| FIRE-Conference | 2/28/2012 | 2/28/2012 | 2/28/2012 4:46:21 PM | P | DONE |
|
|
Regarding phasing.
|
BLD11-02020
| FIRE-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 4:45:40 PM | A | PART |
|
|
Partial completion- new reception, waiting, consultation, blood draw and nurse station only. Noted one exit sign to be repaired, one a/v to be adjusted.
|
BLD11-00346
| FIRE-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 2:07:52 PM | P | PASS |
|
|
Verified previous correction notice items. Fire life safety passed.
|
FIR11-00555
| INSP-Final Inspection | 2/27/2012 | 2/28/2012 | 2/28/2012 1:24:36 PM | A | PASS |
|
|
Verified installation of the knox box and reciept of record of completion documents. Noted phone line one trouble condition on the panel at the time of inspection- tech in route to repair per conversation with tenant.
|
FIR11-00578
| INSP-Sprinkler Rough-in/Hydro | 2/27/2012 | 2/28/2012 | 2/28/2012 1:19:59 PM | A | PART |
|
|
UG fire supply line hydrostatic test passed.
|
FIR11-00680
| INSP-Sprinkler Rough-in/Hydro | 2/27/2012 | 2/28/2012 | 2/28/2012 1:19:12 PM | A | FAIL |
|
|
UG fire supply line hydrostatic test failed due to visible leakage at the 1/2" valve and pressure loss at the guage.
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 2/27/2012 | 2/28/2012 | 2/28/2012 1:17:30 PM | A | PART |
|
|
Overhead work at the 3rd floor rooms 321-327 and the library room are approved for ceiling cover. Noted missing expansion joint at the 2" main on grid line 22. See plans for annotations.
|
FIR11-00527
| INSP-Final Inspection | 2/27/2012 | 2/28/2012 | 2/28/2012 1:12:41 PM | A | PART |
|
|
Fire sprinkler work okay for final when travel caps at pendent heads are removed and two missing escutcheons are installed.
|