ESC13-00011
| Random Inspection | 2/28/2013 | 2/28/2013 | 2/28/2013 12:00:00 AM | P | PASS |
|
|
Dewatering of trench is complete. All water appears to have been retained on site in the retention basin and no discharges to the vegetated upland area occurred.
|
ESC13-00011
| Conference | 2/27/2013 | 2/28/2013 | 2/28/2013 12:00:00 AM | P | CANC |
|
|
PD scheduled meeting to discuss game plan. RP rescheduled for next week.
|
ESC13-00011
| Random Inspection | 2/28/2013 | 2/28/2013 | 2/28/2013 12:00:00 AM | P | PASS |
|
|
Dewatering of trench is complete. All water appears to have been retained on site in the retention basin and no discharges to the vegetated upland area occurred.
|