FIR16-00705
| INSP-Sprinkler Rough-in | 2/28/2017 | 2/28/2017 | 2/28/2017 2:58:00 PM | P | PART |
|
|
Rough-in for the most part passed. Items noted needing correction are branchline restraints are not installed as per plan and are therefore overspaced (54' max.), siesmic bracing of the main piping is missing in several locations and has been noted in "red" on plans and per phone conversation with Tom it appears that the bracing designated as SB-3 (1 1/4") needs to be used on all of the 4" mains (1" has been used), it also appears that sprinkler protection is required below all of the unit heaters (Tom is going to investigate), it appears that the ESFR heads are overspaced in two locations at the Fire Pump/Mechanical Room walls, there is a possible obstruction to the ESFR heads in the south east corner of the warehouse at a HVAC duct penatration.
|
FIR16-00596
| INSP-Sprinkler Rough-in/Hydro | 2/27/2017 | 2/28/2017 | 2/28/2017 2:44:25 PM | A | PASS |
|
|
Underground hydro passed
|
FIR16-00284
| INSP-Sprinkler Rough-in | 2/27/2017 | 2/28/2017 | 2/28/2017 11:11:56 AM | A | PASS |
|
|
The rough to cover on the Dry system is passed. The missing line restraints have been added
|
BLD16-04482
| FIRE-Final Inspection | 2/27/2017 | 2/28/2017 | 2/28/2017 10:27:35 AM | A | PASS |
|
|
Life safety passed
|
FIR16-00822
| INSP-Final Inspection | 2/28/2017 | 2/28/2017 | 2/28/2017 10:27:13 AM | A | PASS |
|
|
Permit finaled
|