Inspections for the day of: Tuesday, February 28, 2017.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00705 INSP-Sprinkler Rough-in2/28/20172/28/20172/28/2017 2:58:00 PMPPART
Rough-in for the most part passed. Items noted needing correction are branchline restraints are not installed as per plan and are therefore overspaced (54' max.), siesmic bracing of the main piping is missing in several locations and has been noted in "red" on plans and per phone conversation with Tom it appears that the bracing designated as SB-3 (1 1/4") needs to be used on all of the 4" mains (1" has been used), it also appears that sprinkler protection is required below all of the unit heaters (Tom is going to investigate), it appears that the ESFR heads are overspaced in two locations at the Fire Pump/Mechanical Room walls, there is a possible obstruction to the ESFR heads in the south east corner of the warehouse at a HVAC duct penatration.
FIR16-00596 INSP-Sprinkler Rough-in/Hydro2/27/20172/28/20172/28/2017 2:44:25 PMAPASS
Underground hydro passed
FIR16-00284 INSP-Sprinkler Rough-in2/27/20172/28/20172/28/2017 11:11:56 AMAPASS
The rough to cover on the Dry system is passed. The missing line restraints have been added
BLD16-04482 FIRE-Final Inspection2/27/20172/28/20172/28/2017 10:27:35 AMAPASS
Life safety passed
FIR16-00822 INSP-Final Inspection2/28/20172/28/20172/28/2017 10:27:13 AMAPASS
Permit finaled