Inspections for the day of: Wednesday, February 28, 2018.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM18-00834 Final2/28/20182/28/20182/28/2018 3:49:18 PMPPASS
ready please call Craig ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
PLM18-00825 Water Heater Final2/28/20182/28/20182/28/2018 3:22:27 PMPPASS
Larry Phone #: ###-####
PLM18-00815 Final2/28/20182/28/20182/28/2018 2:58:03 PMPPASS
2pmish please call Tyler ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
PLM18-00780 Plumbing Rough-in2/28/20182/28/20182/28/2018 2:35:37 PMPPASS
Other contractors should be on site if not please give me a call. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
PLM18-00835 Plumbing Rough-in2/28/20182/28/20182/28/2018 2:26:42 PMPPASS
Phone #: ###-#### Inspection requested via web by steven smith. Steve to cut in 3" c.o. above floor. See on final
PLM18-00831 Plumbing Rough-in2/28/20182/28/20182/28/2018 2:05:30 PMPPASS
Ready now Phone #: ###-#### Inspection requested via web by Jason Gale
PLM18-00776 Plumbing Rough-in2/27/20182/28/20182/28/2018 2:05:30 PMPPASS
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
PLM17-05070 DOC - Permit Finaled2/28/20182/28/20182/28/2018 1:30:28 PMPPASS
PLM18-00656 Final2/27/20182/28/20182/28/2018 12:56:14 PMPPASS
Please call Brad when heading over. ###-#### Phone #: ###-#### Inspection requested via web by Ron Arnold
PLM18-00810 Water Heater Final2/27/20182/28/20182/28/2018 11:26:26 AMAPASS
Phone #: ###-#### Inspection requested via web by Vaughn Carlson. Could not verify co detectors
PLM18-00687 Water and/or Sewer2/27/20182/28/20182/28/2018 11:07:35 AMPPASS
This will be ready at 1 pm. Bob is on site at the above number. Thanks so much!!! Phone #: ###-#### Inspection requested via web by susan love
PLM18-00687 DOC - Permit Finaled2/28/20182/28/20182/28/2018 11:07:21 AMPPASS
water service
PLM18-00649 Plumbing Rough-in2/27/20182/28/20182/28/2018 10:38:51 AMAPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige.
Verify on second half of remodel that air hammer arrestors are installed for all flushometer valves, cleanouts are installed per ISPC 2017 for urinals and back to back fixtures with double santees.
PLM18-00829 Water Heater Final2/28/20182/28/20182/28/2018 9:32:59 AMAPASS
Phone #: ###-#### Inspection requested via web by Benjamin Duskey
PLM18-00823 Plumbing Rough-in2/27/20182/28/20182/28/2018 9:20:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Jason Gonzalez
PLM18-00801 Final2/27/20182/28/20182/28/2018 8:58:06 AMAPASS
Phone #: ###-#### Inspection requested via web by Mary LaFayette
PLM17-01434 Final2/26/20182/28/20182/28/2018 8:51:48 AMACANC
If there are any questions please contact Larry J. at ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
PLM18-00622 Plumbing Rough-in2/27/20182/28/20182/28/2018 8:44:36 AMAPASS
PLM17-00217 PLM-Aging Inspection2/28/20182/28/20182/28/2018 8:19:00 AM PEND
contractor to scehdule
PLM17-03787 Final2/27/20182/28/20182/27/2018 2:41:33 PMAPART
walked through with the plumber. Needs to a union to the rp at the premise protection, certify all backflows and all appliances need to be installed.