ELE19-00720
| Final | 2/28/2019 | 2/28/2019 | 2/28/2019 11:13:34 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Service change final ok
|
MIS19-00056
| ELE-Final | 2/28/2019 | 2/28/2019 | 2/28/2019 11:13:11 AM | P | DONE |
|
|
confirm no electrical No work being done at this time, once remodel starts in back area lights will be change out and a permit will be issued to a licensed contractor
|
ELE19-00687
| Electrical Rough-In | 2/27/2019 | 2/28/2019 | 2/28/2019 10:56:43 AM | A | PASS |
|
|
Keith Phone #: ###-#### Main hall bath and back baths and misc walls in beds ok to cover
|
ELE19-00272
| Final | 2/27/2019 | 2/28/2019 | 2/28/2019 9:56:49 AM | A | PASS |
|
|
solar install ready for inspection; approved plans on site; all work done according to the stamped plans; except for the taps inside the electrical panel, all work is surface/exterior. The solar equipment and meter are in the back yard directly under the array. Call me at 850.8965 before you head to the site, and I''ll arrange someone to be there to get you access inside/back yard. thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Solar Array final ok
|
ELE19-00205
| Conference | 2/27/2019 | 2/28/2019 | 2/28/2019 9:54:43 AM | A | DONE |
|
|
please call before arriving Lee Phone #: ###-#### Discussed service requirements and IDPCO for meter. Owner will drop meter for IDPCO and install a 100 main breaker panel or meter main or find a listed tie down for SQD breaker in a GE panelboard
|