MEC19-00842
| Final | 2/27/2019 | 2/28/2019 | 2/28/2019 3:35:52 PM | P | PASS |
|
|
INSTALLER DAVID ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
MEC19-00852
| Pressure Test | 2/27/2019 | 2/28/2019 | 2/28/2019 2:49:55 PM | P | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire 20lb, 5lb flue
|
MEC19-00852
| Rough-in | 2/27/2019 | 2/28/2019 | 2/28/2019 2:49:31 PM | P | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
MEC19-00854
| Rough-in | 2/27/2019 | 2/28/2019 | 2/28/2019 2:11:52 PM | P | NR |
|
|
Call Jason @ ###-#### with any issues Phone #: ###-#### Inspection requested via web by Angie Maguire
|
MEC19-00854
| Pressure Test | 2/27/2019 | 2/28/2019 | 2/28/2019 2:11:21 PM | P | PASS |
|
|
Call Jason @ ###-#### with any issues Phone #: ###-#### Inspection requested via web by Angie Maguire 20lb gas, 5lb flue
|
MEC19-00856
| Pressure Test | 2/27/2019 | 2/28/2019 | 2/28/2019 1:53:44 PM | P | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire 20lb gas, 5lb flue
|
MEC19-00856
| Rough-in | 2/27/2019 | 2/28/2019 | 2/28/2019 1:53:20 PM | P | PASS |
|
|
Call Jason @ ###-#### with any issues. Phone #: ###-#### Inspection requested via web by Angie Maguire
|
MEC18-05651
| Final | 2/27/2019 | 2/28/2019 | 2/28/2019 1:11:59 PM | P | FAIL |
|
|
Garage code. 9259 or 9250 Phone #: ###-#### Inspection requested via web by Oleg Chervak need airbalance report and duct blast, wet switch on indoor furnace taken apport
|
MEC18-05140
| Final | 2/27/2019 | 2/28/2019 | 2/28/2019 10:46:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC18-05757
| Final | 2/27/2019 | 2/28/2019 | 2/28/2019 10:28:57 AM | A | PASS |
|
|
FRONT DOOR CODE 34567 ANY QUESTIONS SAM JACOBS ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
MEC19-00105
| Final | 2/22/2019 | 2/28/2019 | 2/28/2019 9:29:19 AM | A | FAIL |
|
|
Please call 30 mins prior to arrival to Alex ###-####013 Phone #: ###-#### Inspection requested via web by Andrea Grigsby MEC permit will pass when electrical permit is pulled for new disconnect
|
MEC19-00456
| Final | 2/22/2019 | 2/28/2019 | 2/28/2019 9:20:07 AM | A | PASS |
|
|
30 min precall to Steve @ ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
MEC18-01055
| Mec-Aging Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 8:32:06 AM | | CANC |
|
|
schedual final when complete, permit will expire next aging
|
MEC18-02436
| Mec-Aging Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 8:24:06 AM | | CANC |
|
|
still working
|
MEC19-00556
| Pressure Test | 2/27/2019 | 2/28/2019 | 2/28/2019 3:41:58 AM | A | CANC |
|
|
This inspection was scheduled for today 2/27, and the inspector put a disposition of NR, when in reality it was ready. 3 other guys on site said he walked in, poked his head in the bathroom for five seconds and walked out. Didn''t ask where the HVAC guy is, where the furnace is, didn''t call me, nothing. And this is the same inspector that did the rough in so he knows where everything is. It is ready for a pressure test and I expect it to get inspected >> Inspection requested via web by Bob Ferrin Inspection cancelled from web by: Bob Ferrin
|
MEC18-05757
| Final | 2/27/2019 | 2/28/2019 | 2/27/2019 1:46:48 PM | A | CANC |
|
|
ANY QUESTIONS, PLEASE CALL SAM JACOBS ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|