MIS19-00026
| BLD-Conference | 2/28/2019 | 2/28/2019 | 2/28/2019 5:03:10 PM | P | DONE |
|
|
Per phone conversation, Home owner resgested a wakl thru, No Work has been done...
|
MIS19-00026
| DOC - Permit Finaled | 2/28/2019 | 2/28/2019 | 2/28/2019 5:02:59 PM | P | PASS |
|
|
Per phone conversation, Home owner resgested a wakl thru, No Work has been done...
|
BLD18-02948
| BLD-Ceiling Grid Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 5:00:42 PM | P | CANC |
|
|
Kelly Phone #: ###-####
|
BLD17-03010
| BLD-Foundation | 2/28/2019 | 2/28/2019 | 2/28/2019 5:00:13 PM | P | CANC |
|
|
Tim Phone #: ###-####
|
BLD18-02736
| BLD-Final | 2/26/2019 | 2/28/2019 | 2/28/2019 11:48:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD18-02736
| DOC - Permit Finaled | 2/28/2019 | 2/28/2019 | 2/28/2019 11:48:47 AM | P | PASS |
|
|
|
BLD18-02736
| BLD-Blower Door Test Results | 2/26/2019 | 2/28/2019 | 2/28/2019 11:48:36 AM | A | DONE |
|
|
ACH50- 4.75
|
BLD18-03554
| BLD-Energy code compliance | 2/27/2019 | 2/28/2019 | 2/28/2019 11:48:01 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
|
BLD18-03553
| BLD-Energy code compliance | 2/27/2019 | 2/28/2019 | 2/28/2019 11:47:44 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
|
BLD18-03323
| BLD-Wall Bracing | 2/26/2019 | 2/28/2019 | 2/28/2019 11:47:05 AM | A | PART |
|
|
Minimum 2 anchor bolts per sill plate, and to be no more than 12" from ends of sill plates... Need truss Engineering to be available at Energy inspection...
|
BLD18-03323
| BLD-Framing/Rough-in | 2/26/2019 | 2/28/2019 | 2/28/2019 11:42:00 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|