MEC20-00154
| Rough-in | 2/28/2020 | 2/28/2020 | 2/28/2020 3:47:22 PM | P | PASS |
|
|
Hazen Phone #: ###-####- r/i ok- ok to cover exterior chase- need to seal storm collar by final
|
MEC19-05241
| Rough-in | 2/28/2020 | 2/28/2020 | 2/28/2020 3:08:08 PM | P | PASS |
|
|
Cover inspection for 2nd floor. Project Lead will not be on site but can be reached by phone. ###-#### Phone #: ###-#### Inspection requested via web by Commercial Coordinator- 2nd floor duct seal all rooms ok- ok to insulate suplly and return ducts above offices
|
MEC20-00805
| Final | 2/27/2020 | 2/28/2020 | 2/28/2020 2:27:11 PM | P | PASS |
|
|
Pat Entwistle 12-4pm. Thank you! Phone #: ###-#### Inspection requested via web by Denise Colin- furnace only co ok
|
MEC20-00854
| Final | 2/28/2020 | 2/28/2020 | 2/28/2020 1:56:25 PM | P | PASS |
|
|
Please call 1 hour before to gain access Phone #: ###-#### Inspection requested via web by Lars Fernandez- units 102 202 furnace a/c coil co locking caps ok
|
MEC20-00592
| Final | 2/28/2020 | 2/28/2020 | 2/28/2020 1:40:37 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Small- should have been R/I inspection
|
MEC20-00592
| Rough-in | 2/28/2020 | 2/28/2020 | 2/28/2020 1:40:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Small- R/I ok- 20lb gas pass sectioned tested
|
MEC20-00848
| Final | 2/28/2020 | 2/28/2020 | 2/28/2020 12:41:05 PM | P | PASS |
|
|
Please Contact technician on site to be sure install is ready . Technician on site Kelly Buel-###-#### Phone #: ###-#### Inspection requested via web by Kelly Martin- furnace only co ok
|
MEC20-00490
| Final | 2/25/2020 | 2/28/2020 | 2/28/2020 11:31:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Denise Colin- furnace only in crawl co ok
|
MEC20-00490
| Pressure Test | 2/27/2020 | 2/28/2020 | 2/28/2020 11:30:58 AM | A | CANC |
|
|
Pressure test scheduled for 11:30am Phone #: ###-#### Inspection requested via web by Denise Colin- not needed flue ran thru unconditoned space in crawl
|
MEC20-00780
| Final | 2/26/2020 | 2/28/2020 | 2/28/2020 10:49:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co locking caps ok
|
MEC20-00695
| Pressure Test | 2/28/2020 | 2/28/2020 | 2/28/2020 10:43:06 AM | P | CANC |
|
|
Ed Phone #: ###-####- reschedule for 3-3-20 am per phone call from Diane
|
MEC20-00836
| Pressure Test | 2/27/2020 | 2/28/2020 | 2/28/2020 10:16:01 AM | A | PASS |
|
|
knock on rear door, door bell in front is not currently working. Phone #: ###-#### Inspection requested via web by Brian Preece- 20lb gas pass- need to see regulator installed at final- need to add fireplace to this permit and call in R/I inspection on fireplace- need csst approved nail plates installed 2 locations talked with Eddy about this by phone before sheet rock can be installed- will check on R/I for fireplace
|
MEC20-00381
| Final | 2/25/2020 | 2/28/2020 | 2/28/2020 9:35:41 AM | A | PASS |
|
|
Property owner is requesting an A.M. appointment and he needs a 30 mins call prior to arrival. and he will meet you there. Alan Wolfe ###-#### 257 N. Liberty AC and Furnace final inspections 259 N. Liberty AC final 273 N. Liberty AC final 275 N. Liberty AC final Thank you so much Phone #: ###-#### Inspection requested via web by Shari Wetzler- units 257 electric furnace a/c ok 259 273 and 275 a/c coil only ok
|
MEC20-00756
| Conference | 2/27/2020 | 2/28/2020 | 2/28/2020 8:57:15 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- went over exhaust penetrations and need to resubmit man j for the way system will be installed
|
MEC20-00757
| Conference | 2/27/2020 | 2/28/2020 | 2/28/2020 8:56:31 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- went over exhaust penetrations and need to resubmit man j for the way system will be installed
|
MEC20-00755
| Conference | 2/27/2020 | 2/28/2020 | 2/28/2020 8:55:48 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- went over exhaust penetrations and need to resubmit man j for the way system will be installed
|
MEC20-00758
| Conference | 2/27/2020 | 2/28/2020 | 2/28/2020 8:55:00 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- went over exhaust penetrations and to resubmit man j for way will be installed
|
MEC20-00838
| Final | 2/27/2020 | 2/28/2020 | 2/28/2020 8:42:44 AM | A | CANC |
|
|
Please call Curtis with any questions ###-#### Phone #: ###-#### >> Inspection requested via web by Nick Drake Inspection cancelled from web by: Nick Drake
|
MEC19-02034
| Mec-Aging Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 7:42:30 AM | | FAIL |
|
|
needs called in for final when ready- BLD still open
|
MEC20-00490
| Pressure Test | 2/25/2020 | 2/28/2020 | 2/27/2020 2:33:25 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Denise Colin Inspection cancelled from web by: Denise Colin
|