BLD00-00415
| BLD-Framing/Rough-in | 2/28/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | A | PASS |
|
|
roger-- ###-#### fr Ft. ok setbacks ok. 2/29/00 3:15:17 PM
|
BLD99-00605
| BLD-Framing/Rough-in | 2/28/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | A | FAIL |
|
|
###-#### bld 17c Work in progress pend reinsp. approx. Monday. 2/29/00 3:15:34 PM
|
BLD00-00127
| BLD-Concrete | 2/28/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | A | PASS |
|
|
###-#### Footing & setbacks ok. 2/29/00 3:15:08 PM
|
BLD98-03712
| BLD-Final | 2/29/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | P | FAIL |
|
|
jude ###-#### fn occ Handrails & addresses. 3/1/00 11:11:59 AM
|
BLD98-02235
| BLD-Framing/Rough-in | 2/29/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 09:15:57. Contact: ###-####. Pagent rm. ceiling rm. 3/1/00 11:12:31 AM
|
BLD99-03737
| BLD-Footing | 2/29/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | P | FAIL |
|
|
###-#### dean Canceled. 3/1/00 11:12:39 AM
|
BLD99-02049
| BLD-Foundation | 2/29/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | P | PART |
|
|
LMN grid 6 level 5 and N1 and M1 columns on level 5 Tom ###-#### LMW grid level 5, N1 M1 columns level 5 pending spec. insp. report. 3/1/00 11:13:03 AM
|
BLD99-01718
| BLD-Energy code compliance | 2/28/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 10:13:47. Contact: ###-####. Insulation ok 2hr wall must be reinspected for compliance. 3/1/00 11:13:21 AM
|
BLD99-02802
| BLD-Energy code compliance | 2/28/2000 | 2/29/2000 | 2/29/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 10:14:45. Contact: ###-####.
|