Inspections for the day of: Tuesday, February 29, 2000.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00059 BLD-Framing/Rough-in2/28/20002/29/20002/29/2000 12:00:00 AMAFAIL
###-#### Need approved plan, still installing HD's & blocking and still stapling/nailng off. 3/1/00 11:10:01 AM
BLD00-00010 BLD-Framing/Rough-in2/28/20002/29/20002/29/2000 12:00:00 AMAFAIL
###-#### Need truss engineering & infiltration package not done- no inspection performed. 3/1/00 11:09:39 AM
BLD99-03161 BLD-Framing/Rough-in2/28/20002/29/20002/29/2000 12:00:00 AMAFAIL
###-#### Not nailed off per engineers letter- no one on site. 3/1/00 11:07:35 AM
BLD99-01756 BLD-Final2/28/20002/29/20002/29/2000 12:00:00 AMPPASS
###-#### chip\\ C/C issued. 3/1/00 11:10:13 AM
BLD99-03581 BLD-Framing/Rough-in2/29/20002/29/20002/29/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/29/2000 at 07:47:31. Contact: ###-####. Finishing truss engineering. Need calcs per plan, squash blocks, solid studs under girders & transger all point load. 3/1/00 11:09:15 AM
BLD99-03709 BLD-Framing/Rough-in2/29/20002/29/20002/29/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/29/2000 at 10:25:26. Contact: .
BLD99-00157 BLD-Framing/Rough-in2/29/20002/29/20002/29/2000 12:00:00 AMPFAIL
###-#### 2227 Skipperling Ln. already finaled- called both contact #'s. Holton Homes aked to recall with correct infor w/msg. left on answering machine. 3/1/00 11:08:34 AM