ELE07-02128
| Final | 2/29/2008 | 2/29/2008 | 2/29/2008 3:59:12 PM | P | PASS |
|
|
allen Phone #: ###-####
|
ELE07-02128
| Permanent Service | 2/29/2008 | 2/29/2008 | 2/29/2008 3:58:59 PM | P | PASS |
|
|
p/s u/g new ok
|
ELE06-01438
| Final | 2/29/2008 | 2/29/2008 | 2/29/2008 3:37:16 PM | P | PASS |
|
|
call Paul 1/2 hr prior to going Phone #: ###-#### ok card signed
|
ELE07-03876
| Final | 2/29/2008 | 2/29/2008 | 2/29/2008 2:49:38 PM | P | PASS |
|
|
jean Phone #: ###-#### ok
|
ELE08-00345
| Electrical Rough-In | 2/29/2008 | 2/29/2008 | 2/29/2008 2:13:31 PM | P | FAIL |
|
|
reinspect; Greg Phone #: ###-#### correction not made still needs 11/4" for cables parallel to studs called left message
|
ELE08-00500
| Permanent Service | 2/29/2008 | 2/29/2008 | 2/29/2008 1:42:40 PM | P | CANC |
|
|
Roy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt see added r/i
|
ELE08-00500
| Electrical Rough-In | 2/29/2008 | 2/29/2008 | 2/29/2008 1:42:19 PM | P | PART |
|
|
Roy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt partial u/g ok
|
ELE08-00494
| Electrical Rough-In | 2/29/2008 | 2/29/2008 | 2/29/2008 1:04:32 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA walls and ceilings ok
|
ELE08-00505
| Electrical Rough-In | 2/29/2008 | 2/29/2008 | 2/29/2008 12:25:05 PM | P | PART |
|
|
wall rough-in, cal John Phone #: ###-#### Internet Inspection Request from: John Campbell walls ADA restrms
|
ELE08-00296
| Electrical Rough-In | 2/28/2008 | 2/29/2008 | 2/29/2008 10:59:16 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/28/2008 at 2:56:38 PM. Contact: ###-####. 1st level of u/g duct banks ok
|
ELE07-03907
| Electrical Rough-In | 2/28/2008 | 2/29/2008 | 2/29/2008 10:07:47 AM | A | PART |
|
|
Ceiling inspection. St. Mark''s School Addition. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery ok
|
ELE08-00138
| Final | 2/29/2008 | 2/29/2008 | 2/29/2008 9:41:25 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/29/2008 at 8:07:01 AM. Contact: (208) ok
|
ELE08-00200
| Final | 2/29/2008 | 2/29/2008 | 2/29/2008 9:41:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/29/2008 at 5:54:46 AM. Contact: ###-####. ok
|
ELE08-00345
| Electrical Rough-In | 2/28/2008 | 2/29/2008 | 2/29/2008 8:30:38 AM | A | FAIL |
|
|
craig- call 1st before insp Phone #: ###-#### called left message, corr 300.4 shall provide 11/4" for cables parallel to framing members, B C C shall complete makeup
|
ELE08-00446
| Electrical Rough-In | 2/28/2008 | 2/29/2008 | 2/28/2008 3:46:20 PM | A | FAIL |
|
|
Phone #: ###-#### corr called300.10&12 tighten all locknuts, 110.3(B) use only manufactures listed breakers, and 20 amp max breaker for a/c, 312.5(C) romex not allowed in concuit, unless done as code noted states, 408.7 seal unused breaker openings
|