Inspections for the day of: Wednesday, February 29, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00301 INSP-Sprinkler Rough-in/Hydro2/28/20122/29/20123/1/2012 7:48:24 AMPPART
Re-inspection for corrections system 8 sub fab include the following locations: added coverage at extended ductwork, over spacing at sub fab mechanical, coverage added at the catwalk and soffits between elevator machine room 001A and communication room 001B.
FIR11-00431 INSP-Sprinkler Rough-in/Hydro2/28/20122/29/20123/1/2012 7:39:43 AMAPART
Re-inspection for system 2 corrections finished at the following locations: hall 100R including added seismic bracing, hangers, and spacing okayed with the exception of one area at the intersection of the corridors @ 140ft2: west stair 100W okay for cover: TEM labs 104B thru 104D approved for cover, noted cap at 4" grid main in TEM lab 104E terminates inside a sheetrock wall: auxillary drain at the 4" main relocated to the 6" main at link 100A.
FIR11-00659 INSP-Sprinkler Rough-in/Hydro2/28/20122/29/20123/1/2012 7:21:09 AMAPART
Overhead hydrostatic test and rough-in inspection completed acceptable.
FIR11-00550 INSP-Final Inspection2/27/20122/29/20123/1/2012 7:18:37 AMPPART
Completed device testing at all tenant rooms on the 1st thru 5th floors including ADA rooms and notification appliances in common and public areas. Items noted include four HD to be replaced, one tenant denied access for inspection purposes, cd settings at ADA rooms need adjusted. Provide as-built drawings.
BLD12-00281 FIRE-Final Inspection2/28/20122/29/20122/29/2012 11:09:02 AMAPASS
Life safety passed on the condition that approved hardware is installed at the back door including removal of the surface bolt, manual thumbturn, door knob and 2x4 crossbar. This to be completed prior to structural final inspection for verification of compliance as discussed with tenant and tenant rep.
FIR11-00631 INSP-Sprinkler Rough-in/Hydro2/27/20122/29/20122/29/2012 11:03:37 AMACANC
Overbooked
FIR12-00011 INSP-Final Inspection2/27/20122/29/20122/29/2012 11:03:04 AMACANC
Overbooked
BLD10-02412 FIRE-Final Inspection2/28/20122/29/20122/29/2012 10:54:34 AMAPASS
Structural inspector to verify conditions are met per agreement with contractor and TY.
FIR12-00111 INSP-Sprinkler Rough-in2/28/20122/29/20122/29/2012 10:46:09 AMAPART
Overhead modifications at the tenant remodel are approved for drop ceiling cover.
BLD11-02870 FIRE-Final Inspection2/28/20122/29/20122/29/2012 10:44:20 AMAPASS
Correction items verified for completion. Fire life safety inspection passed. * NOTE: Per general contractor and fire sprinkler contractor survey, head count in the building remains below 100. Therefore, conditions per the UFC under which the structure was built still apply regarding offsite monitoring.
FIR12-00015 INSP-Final Inspection2/28/20122/29/20122/29/2012 10:37:43 AMAPASS
Scope of work passed final walkthrough- missing escutcheon installed while on site. Fire sprinkler permit finaled.
FIR11-00448 INSP-Sprinkler Rough-in/Hydro2/28/20122/29/20122/28/2012 11:44:52 AMACANC
Phone #: ###-#### >> Inspection requested via web by Alicia Pauley Inspection cancelled from web by: Alicia Pauley