FIR11-00607
| INSP-Sprinkler Rough-in/Hydro | 2/29/2012 | 2/29/2012 | 3/1/2012 12:00:00 AM | P | PASS |
|
|
Underground Hydro test passed
|
FIR11-00680
| INSP-Sprinkler Rough-in/Hydro | 2/29/2012 | 2/29/2012 | 2/29/2012 12:00:00 AM | P | PASS |
|
|
Underground hydro passed, no leakeage.
|
FIR12-00013
| INSP-Sprinkler Rough-in/Hydro | 2/28/2012 | 2/29/2012 | 2/29/2012 12:00:00 AM | P | PASS |
|
|
Rough in was ok. Plastic, was spread over the piping but there was no insulation. One bathroom had changed. There will be a pocket door that separates the area. In essecence, the are will become to small bathrooms which do not require sprinklers.
|
FIR11-00527
| INSP-Final Inspection | 2/29/2012 | 2/29/2012 | | P | |
|
|
John Phone #: ###-####
|