FIR16-00124
| INSP-Final Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 3:32:12 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00022
| INSP-Sprinkler Rough-in/Hydro | 2/26/2016 | 2/29/2016 | 2/29/2016 2:47:57 PM | P | PASS |
|
|
Overhead hydro passed
|
FIR15-00715
| INSP-Sprinkler Rough-in/Hydro | 2/26/2016 | 2/29/2016 | 2/29/2016 2:34:15 PM | P | PASS |
|
|
Overhead hydro test passed.
|
FIR15-00716
| INSP-Sprinkler Rough-in/Hydro | 2/26/2016 | 2/29/2016 | 2/29/2016 2:31:40 PM | P | PASS |
|
|
Overhead hydro test passed.
|
FIR15-00717
| INSP-Sprinkler Rough-in/Hydro | 2/26/2016 | 2/29/2016 | 2/29/2016 2:31:07 PM | P | PASS |
|
|
Overhead hydro test passed.
|
BLD16-00183
| FIRE-Final Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 2:26:40 PM | P | FAIL |
|
|
Provide exit signage as per the city approved plans. All other items appear ok.
|
MIS16-00054
| FIR-Conference | 2/26/2016 | 2/29/2016 | 2/29/2016 2:06:20 PM | A | DONE |
|
|
I met and spoke to Gracie Garcia about the need to get an occupancy permit applied for and issued so that the associated inspection could be performed. I set up a follow up inspection for two weeks from now.
|
FIR16-00032
| INSP-Final Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 12:07:32 PM | P | PASS |
|
|
Permit finaled
|
BLD15-04138
| FIRE-Final Inspection | 2/26/2016 | 2/29/2016 | 2/29/2016 10:11:46 AM | P | PART |
|
|
A temporay occupancy is being given with Scott's permission. As per the fire code review comments, a 1 hour wall needs to be provided. It does not appear that "house keeping" should be an issue due to construction type and size of the booth. Per ESI superintendant the wall will be installed with-in the two week time period for a temporary occupancy. A follow up inspection for myself has been scheduled.
|
FIR16-00123
| INSP-Final Inspection | 2/26/2016 | 2/29/2016 | 2/29/2016 10:01:56 AM | P | PASS |
|
|
Permit finaled
|
FIR16-00104
| INSP-Sprinkler Rough-in | 2/26/2016 | 2/29/2016 | 2/29/2016 8:21:12 AM | A | PASS |
|
|
Remaining underground is ok to cover on the east building.
|
BLD15-02395
| FIRE-Final Inspection | 2/26/2016 | 2/29/2016 | 2/29/2016 8:20:15 AM | A | PASS |
|
|
Life safety passed. Contractor to get plan review approval for deleting the east exit door prior to a building signoff.
|