BLD13-03581 BLD-Aging Inspection2/29/20162/29/20163/1/2016 10:52:45 AM PASS
BLD13-03582 BLD-Aging Inspection2/29/20162/29/20163/1/2016 10:43:32 AM PASS
BLD13-03588 BLD-Aging Inspection2/29/20162/29/20163/1/2016 10:39:48 AM PASS
BLD13-03589 BLD-Aging Inspection2/29/20162/29/20163/1/2016 8:34:51 AM PASS
BLD13-03592 BLD-Aging Inspection2/29/20162/29/20163/1/2016 8:31:14 AM PASS
BLD13-03590 BLD-Aging Inspection2/29/20162/29/20163/1/2016 8:08:47 AM PASS
BLD15-04490 BLD-Foundation2/29/20162/29/20162/29/2016 4:03:54 PMPPASS
Stemwall rebar, late PM if possible Phone #: ###-#### Inspection requested via web by Mike McHargue. Perimeter stemwall and interior column pad footings ok.
BLD16-00218 BLD-Final2/27/20162/29/20162/29/2016 3:16:07 PMPDONE
Phone #: ###-#### Inspection requested via web by sheila fawley. All work appeared to be done in accordance with local codes and ordinances.
BLD16-00218 DOC - Permit Finaled2/29/20162/29/20162/29/2016 3:15:52 PMPPASS
BLD16-00219 BLD-Final2/27/20162/29/20162/29/2016 3:15:35 PMPDONE
Phone #: ###-#### Inspection requested via web by sheila fawley
BLD16-00219 DOC - Permit Finaled2/29/20162/29/20162/29/2016 3:15:16 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD16-00217 BLD-Final2/27/20162/29/20162/29/2016 3:13:56 PMPDONE
Phone #: ###-#### Inspection requested via web by sheila fawley
BLD16-00217 DOC - Permit Finaled2/29/20162/29/20162/29/2016 3:13:44 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD16-00537 BLD-Final2/27/20162/29/20162/29/2016 3:13:27 PMPDONE
Phone #: ###-#### Inspection requested via web by sheila fawley
BLD16-00537 DOC - Permit Finaled2/29/20162/29/20162/29/2016 3:13:12 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
MIS16-00046 BLD-Conference2/22/20162/29/20162/29/2016 2:52:09 PMAPASS
MIS16-00046 DOC - Permit Finaled2/29/20162/29/20162/29/2016 2:51:57 PMPPASS
Fermenting chamber is built from rigid insulation and is less than 10s.f. and is not a permanent structure. Not regulated by IBC. However, owner siad they would remove.
BLD16-00026 BLD-Ceiling Grid Inspection2/29/20162/29/20162/29/2016 1:58:08 PMPCANC
Part // Roger Phone #: ###-####. Hardlid in changing room area ok.
BLD15-01754 BLD-Foundation2/29/20162/29/20162/29/2016 1:30:21 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD16-00378 BLD-Foundation2/29/20162/29/20162/29/2016 1:28:18 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD15-04265 BLD-Final2/26/20162/29/20162/29/2016 10:20:09 AMADONE
Phone #: 2085990155 >> Inspection requested via mobile web by Steve sobien
BLD15-04265 DOC - Permit Finaled2/29/20162/29/20162/29/2016 10:19:34 AMPPASS
BLD16-00183 BLD-Final2/26/20162/29/20162/29/2016 10:17:42 AMANR
Dan Phone #: ###-####. Needs fire/life/safety. Will be on temp, electrical for lifts not yet started.
BLD15-02662 BLD-Wall Bracing2/25/20162/29/20162/29/2016 9:44:40 AMAPASS
Shear // Cinnamon Phone #: ###-####
BLD15-04414 BLD-Foundation2/26/20162/29/20162/29/2016 9:21:35 AMAPASS
Juanita Phone #: ###-####
BLD15-00926 BLD-Framing/Rough-in2/26/20162/29/20162/29/2016 9:02:22 AMAFAIL
Scott Phone #: ###-####. HAngars require full depth blocking and need to be double on A5 trusses, do not reuse these hanhars (overdriven). Nail off 2ply B3 girder as per the engineering. Complete lateral bracing on A4,A5 B1,B2 and B3 trusses. Appears that interior bearing on A5 trusses is off. Top chord wood penetration at 2hr. fire wall? A correction notice was issued.
BLD15-00925 BLD-Framing/Rough-in2/26/20162/29/20162/29/2016 9:01:53 AMAFAIL
Scott Phone #: ###-####. HAngars require full depth blocking and need to be double on A5 trusses, do not reuse these hanhars (overdriven). Nail off 2ply B3 girder as per the engineering. Complete lateral bracing on A4,A5 B1,B2 and B3 trusses. Appears that interior bearing on A5 trusses is off. Top chord wood penetration at 2hr. fire wall? A correction notice was issued.