Inspections for the day of: Tuesday, February 3, 1998.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-03848 INSP - Final2/3/19982/3/19982/3/1998 12:00:00 AM FAIL
unable to locate dryer vent termination to job supper he will call heat co. also under floor is full of water.r
MEC97-03848 INSP - Final2/3/19982/3/19982/3/1998 12:00:00 AM FAIL
unable to locate dryer vent termination to job supper he will call heat co. also under floor is full of water.r
MEC98-00266 INSP - Rough-in & Gas Pressure2/3/19982/3/19982/3/1998 12:00:00 AM PASS
BLD97-03697 INSP - Framing/Rough-in2/3/19982/3/19982/3/1998 12:00:00 AM PASS
/ / 407 - TRUSS AT FRONT BAY REPAIRED BY TRUSS CO.
BLD97-03318 INSP - Framing/Rough-in2/3/19982/3/19982/3/1998 12:00:00 AM PART
Bob & I have meet with contractor about the winders ,he aggreed to reconstruct them . ok to start sheetrock. will call for re-insp of winders.
BLD97-03558 INSP - Framing/Rough-in2/2/19982/3/19982/3/1998 12:00:00 AMAFAIL
left corrections.
BLD97-02882 INSP - Framing/Rough-in2/2/19982/3/19982/3/1998 12:00:00 AMAPASS
david ###-#### framing reinspect
MEC97-02809 INSP - Final2/3/19982/3/19982/3/1998 12:00:00 AMPFAIL
left correction.Scheduled by Hello!.
MEC97-02809 INSP - Final2/3/19982/3/19982/3/1998 12:00:00 AMPFAIL
left correction.Scheduled by Hello!.
MEC97-02810 INSP - Final2/3/19982/3/19982/3/1998 12:00:00 AMPPASS
Scheduled by Hello!.
MEC97-02810 INSP - Final2/3/19982/3/19982/3/1998 12:00:00 AMPPASS
Scheduled by Hello!.
BLD97-03318 INSP - Energy code compliance2/2/19982/3/19982/3/1998 12:00:00 AMPPASS
RON AT ###-####
BLD97-03431 INSP - Framing/Rough-in2/2/19982/3/19982/3/1998 12:00:00 AMPPASS
bob ###-#### sheer panel inspection
BLD97-03735 INSP - Framing/Rough-in2/3/19982/3/19982/3/1998 12:00:00 AMPPASS
framing/engineering talk to framer john ###-#### ###-####
BLD98-00120 INSP - Framing/Rough-in2/2/19982/3/19982/3/1998 12:00:00 AMPPASS
talked with brent about the crawl space he will some additional support to floor joist.
BLD98-00188 INSP - Foundation2/3/19982/3/19982/3/1998 12:00:00 AMPPASS
still have some interior footing work to do .