PLM99-04156
| Water and/or Sewer | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 12:19:09. Contact: ###-####. Waste, vent and water test required. 2/4/00 11:38:44 AM
|
PLM00-00277
| Water and/or Sewer | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | PASS |
|
|
###-#### S/W final ok. 2/4/00 11:38:28 AM
|
PLM00-00251
| Water and/or Sewer | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | PASS |
|
|
###-#### S/W final ok. 2/4/00 11:38:21 AM
|
PLM00-00258
| Plumbing Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | PASS |
|
|
###-#### R/I ok. 2/4/00 11:36:02 AM
|
PLM00-00263
| Final | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | FAIL |
|
|
manufacture mobile home installer hook-up for the connection only Building drain background, roll clamps at service connections, T&P drain to exterior, hbub on bury hydrant. 2/4/00 11:38:10 AM
|
PLM00-00280
| Sprinkler (Final) | 2/3/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | P | PART |
|
|
juston--- ###-#### spr Tie in ok. 2/4/00 11:36:32 AM
|
PLM98-03057
| Final | 2/3/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 09:19:59. Contact: ###-####. Test RP on DI make up. 2/4/00 11:36:16 AM
|
PLM99-04032
| Final | 2/3/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 09:31:15. Contact: ###-####. Set all fixtures, test premis protection, turn on water. 2/4/00 11:36:50 AM
|
PLM00-00258
| Plumbing Rough-in | 2/3/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | P | FAIL |
|
|
###-#### W&V and water systems tests failed. 2/4/00 11:37:23 AM
|
PLM99-03025
| Plumbing Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 15:55:20. Contact: ###-####. R/I ok except gutter drain connections. 2/4/00 11:37:04 AM
|