MEC99-04221
| Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 11:34:42. Contact: ###-####.
|
MEC99-04221
| Pressure Test | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 11:35:08. Contact: ###-####.
|
BLD99-03573
| BLD-Framing/Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | FAIL |
|
|
reinspection bruce ###-#### Done by #407. 2/4/00 11:15:39 AM
|
MEC99-03808
| Final | 2/2/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 16:57:50. Contact: ###-####.
|
BLD99-02205
| BLD-Final | 2/3/2000 | 2/3/2000 | 2/3/2000 12:00:00 AM | P | PASS |
|
|
Gil; ###-####. Ok for perm. occ. 2/4/00 11:39:06 AM
|