Inspections for the day of: Monday, February 3, 2003.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-03457 PLM-Aging Inspection2/3/20032/3/20032/3/2003 12:00:00 AM PASS
final ok 2/3/2003 9:31:13 AM
PLM03-00254 Plumbing Rough-in1/31/20032/3/20032/3/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 01/31/2003 at 13:00:56. Contact: . gw ok 2/3/2003 10:12:16 AM
PLM03-00254 Groundwork2/3/20032/3/20032/3/2003 12:00:00 AMAPASS
gw ok
PLM03-00184 Plumbing Rough-in2/3/20032/3/20032/3/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/03/2003 at 09:36:29. Contact: ###-####. top ri ok need an rp for the make up water to the heating system above grade with adequate drainage, the outside potable water heating system has been deleated, they say, but it hasnt been removed yet. 2/3/2003 4:34:52 PM
PLM03-00268 Plumbing Rough-in2/3/20032/3/20032/3/2003 12:00:00 AMPPASS
###-#### ri ok 2/3/2003 3:28:46 PM
PLM03-00266 Groundwork2/3/20032/3/20032/3/2003 12:00:00 AMPFAIL
BUD--CALL 1ST BEFORE INSP; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie pipe new waste to building sewer by gravity, sewer under new shop must be approved for use with in a building. 2/3/2003 5:16:45 PM
PLM02-03321 Final2/3/20032/3/20032/3/2003 12:00:00 AMPPASS
final ok
PLM01-02701 Final2/3/20032/3/20032/3/2003 12:00:00 AMPPASS
final ok 2/3/2003 3:15:10 PM
PLM02-03320 Final1/30/20032/3/20032/3/2003 12:00:00 AMPPASS
.###-#### final ok 2/3/2003 3:11:47 PM
PLM03-00265 Plumbing Rough-in2/3/20032/3/20032/3/2003 12:00:00 AMPPASS
JIM- ###-#### ri ok 2/3/2003 4:52:40 PM
PLM02-02711 Final2/3/20032/3/20032/3/2003 12:00:00 AMPPASS
call Gary at work to meet there ###-#### or ###-#### final ok 2/3/2003 5:34:45 PM