BLD02-02719
| BLD-Foundation | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD02-02720
| BLD-Footing | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD02-02897
| BLD-Framing/Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
RON CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD00-03017
| BLD-Footing | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 11:38:40. Contact: .
|
BLD00-03017
| BLD-Footing | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
###-#### call first
|
BLD02-02413
| BLD-Wall cover | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 13:48:55. Contact: ###-####.
|
BLD03-00019
| BLD-Framing/Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PART |
|
|
shear -bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie.exterior ok, need the energy calcs Mec Check not on plans, appears to have never been on the plans, called builder will get them and call me when he has thaem a correction has been posted that I need to review them, as siding now at own risk.Contractor understands this. I would stop job now if I had evedence of removal from plans but this is not the case it would appear that the plan checker left them off. 2/3/2003 1:48:45 PM
|
BLD02-03017
| BLD-Conference | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | FAIL |
|
|
Called builder and posted a c/n do not side. 2/3/2003 10:06:10 AM
|
BLD02-03017
| BLD-Conference | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | FAIL |
|
|
called builder and posted c/n do not side. 2/3/2003 10:06:27 AM
|
BLD02-03017
| BLD-Framing/Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | FAIL |
|
|
###-#### posted a c/n. 2/3/2003 5:22:40 PM
|
BLD02-02287
| BLD-Framing/Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 15:52:27. Contact: ###-####.conference room. 2/3/2003 5:23:42 PM
|
BLD02-02142
| BLD-Final | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PASS |
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC02-03073
| Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 08:00:53. Contact: ###-####.
|
BLD02-02325
| BLD-Final | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | NR |
|
|
phil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Called builder he wanted me there at 2 its 2:15 and the electrical has not been approved yet and I am 2 blocks away and now going to a different job. Shold not have been called in without this finaled. 2/3/2003 2:22:16 PM
|