MEC03-00296
| Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 1:48:33 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener Inspection cancelled from web by: Trina Stracener
|
MEC03-00296
| Pressure Test | 1/31/2003 | 2/3/2003 | 2/3/2003 1:48:28 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener Inspection cancelled from web by: Trina Stracener
|
MEC02-01992
| Final | 1/28/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PART |
|
|
Cl Ben~Final #521-548, RI/Final Middle section phase I 16 FSD, 20 Rms, RI/Final #525-529 Approx 2 hrs. Thanks:~); Phone #: ###-#### Internet Inspection Request from: Amanda Van Paepeghem rooms 2/3/2003 9:43:46 AM...check access door s/f in elec room on next inspection 2/3/2003 9:47:40 AM
|
MEC03-00308
| Final | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | DONE |
|
|
###-#### jeanette....###-#### 2/3/2003 9:54:27 AM this was an elec w/h 2/3/2003 9:55:01 AM
|
MEC03-00284
| Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PART |
|
|
###-#### mya call for access STILL NEED TO SEE FLUE WHEN IT TERMINATES THROUGH THE ROOF 2/4/2003 8:19:10 AM
|
MEC03-00107
| Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 14:05:44. Contact: ###-####.
|
MEC03-00107
| Pressure Test | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 14:05:54. Contact: ###-####.
|
MEC03-00311
| Final | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | PASS |
|
|
TED; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC02-02643
| Final | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 15:02:31. Contact: ###-####.--per dixie??-call 1st before insp skip cell ###-#### move furn disconnect from furnace door..need 8" comb air to f/wh..complete prv at w/h 2/3/2003 11:14:02 AM
|
MEC03-00213
| Final | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | FAIL |
|
|
###-#### will extend r/a plenum 10' from firebox and install fire damper 2/3/2003 4:31:25 PM
|
MEC03-00302
| Pressure Test | 1/31/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PART |
|
|
GAS TEST ONLY TO DRYER. PLEASE INSPECT AT APPROXIMATELY 1:30PM
THANKS
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC03-00167
| Final | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | NR |
|
|
fn -gary-- ###-####
|
MEC03-00248
| Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
MEC03-00248
| Pressure Test | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
MEC03-00195
| Final | 2/3/2003 | 2/3/2003 | 2/3/2003 12:00:00 AM | P | PASS |
|
|
homeowner took off he will be home until 3:00\\###-####
|